1 PROJECT: OLD MAIN BY: REYLNNE BECCA STEVEN MANDY

2 MISSION A Potential Water Harvest for Old Main
How to Incorporate the Surrounding Buildings Storage Requirements

3 WATER HARVESTING FOR OLD MAIN
USE OLD MAIN TO IRRAGATE PLANT LIFE

4 THE FOUNTAIN Old Main’s Fountain will be used to Water the lawn
surrounding the building Try to find a set monthly Schedule to drain and irrigate water to lawn.

5 NEIGHBORING BUILDINGS
We recommend using the Social Sciences and Caesar E Chavez Buildings These Buildings have the Capability of irrigating the 2000sq/ft turf area

6 PROCESS OF OBTAINING WATER
Apply a roof “catchment” system to the buildings Drain water caught, into a storage unit Hold water in storage unit to be used throughout the year for watering the turf area.

7 PROBLEM After collecting water from roof tops, we plan on running
pipes under the the ground into an irrigation system for the turf area

8 SOCIAL SCIENCIES BUILDING
 Table 2  A  B  C  D  E  F  G  H IRRIGATION Roof area sq. ft. 26385 HARVESTED REQUIREM. NET * Turf area in sq. ft. 2000 ET turf Precip Irr. Require. Storage sq. ft on turf ET-precip Harv-Irr. 1287 Cu. Ft from ET Turf for sq.ft. turf Precip. Cu. Ft. cu.ft. Month ft. cu. Ft cu. Ft. January 0.09 2309 0.17 347 175 172 2137 14620 February 0.08 2199 0.21 428 167 262 1937 16557 March 0.07 1869 0.35 696 142 555 1314 17871 April 0.04 945 0.47 937 72 865 80 17952 May 0.02 418 0.58 1155 32 1123 -706 17246 June 528 0.61 1230 40 1190 -662 16584 July 0.15 3892 0.53 1065 295 770 3122 August 3870 932 293 639 3231 6353 September 2089 0.42 847 158 689 1400 7753 October 1781 0.34 673 135 538 1243 8996 November 0.05 1429 420 108 312 1118 10113 December 2485 303 188 115 2370 12483 TOTAL 0.90 23812 4.52 9034 1805 7229

9 CAESAR E CHAVEZ Table 3 A B C D E F G H IRRIGATION Roof area sq. ft.
IRRIGATION Roof area sq. ft. 14872 HARVESTED REQUIREM. NET * Turf area in sq. ft. 2000 ET turf Precip Irr. Require. Storage sq. ft on turf ET-precip Harv-Irr. 2112 Cu. Ft from ET Turf for sq.ft. turf Precip. Cu. Ft. cu.ft. Month ft. cu. Ft cu. Ft. January 0.09 1301 0.17 347 175 172 1130 6829 February 0.08 1239 0.21 428 167 262 978 7807 March 0.07 1053 0.35 696 142 555 499 8306 April 0.04 533 0.47 937 72 865 -332 7974 May 0.02 235 0.58 1155 32 1123 -888 7086 June 297 0.61 1230 40 1190 -892 6193 July 0.15 2194 0.53 1065 295 770 1423 August 2181 932 293 639 1542 2966 September 1177 0.42 847 158 689 489 3455 October 1004 0.34 673 135 538 466 3920 November 0.05 806 420 108 312 494 4414 December 1400 303 188 115 1285 5700 TOTAL 0.90 13422 4.52 9034 1805 7229

10 MISSION: COMPLETE