Presentation is loading. Please wait.

Presentation is loading. Please wait.

GIFTS System Calibration Requirements Flowdown

Similar presentations


Presentation on theme: "GIFTS System Calibration Requirements Flowdown"— Presentation transcript:

1 GIFTS System Calibration Requirements Flowdown
Hank Revercomb 9 March 2004

2 GIFTS Overall Absolute Calibration Budget
Subject of BB CDR

3 GIFTS Top-level Absolute Calibration Budget

4 GIFTS Spectral Calibration Budget
Standard Atmosphere used for conversion to brightness temperature ** **3-sigma for single sample is 3 ppm-100 sample average assumed

5 GIFTS Radiometric Calibration Budget (Absolute)

6 GIFTS Radiometric Calibration Equation: Basis for Uncertainty Modeling
Radiance N derived from raw spectra of Earth (CE), Space (CS), and the internal Hot (CH) and Cold (CC) Blackbodies t is the signal transmission of the telescope mirrors & m is the transmission of the Blackbody pick-off mirror Bi is the Radiance from the Hot, Cold, and Space References [eg. BH=H B(TH) + (1- H) B(Tstr), where B(T) is the Planck function and Tstr is the effective structure temperature for reflection]

7 GIFTS Absolute Calibration-Longwave
Longwave Band (800 cm-1) Tc=255, Th=290, Ts=240, Tt=280 Requirement External BB GIFTS (excluding uncertainty in correction for Non-linearity & Polarization)

8 GIFTS Absolute Calibration-Shortwave
Shortwave Band (1800 cm-1) Tc=255, Th=290, Ts=240, Tt=280 Requirement External BB GIFTS (excluding uncertainty in correction for Non-linearity & Polarization)

9 GIFTS Calibration Error Sources-LW
Longwave Band (800 cm-1) Tc=255, Th=290, Ts=240, Tt=280 0.3% NEN/4=0.05 0.3 K

10 GIFTS Calibration Error Sources-SW
Shortwave Band (1800 cm-1) Tc=255, Th=290, Ts=240, Tt=280 0.5% NEN/4=0.0025 0.3 K

11 GIFTS Blackbody Budget
Subject of this BB Subsystem CDR: Budget is 0.5 K 3-sigma Absolute & 0.1 K 3-sigma Reproducibility, by analogy


Download ppt "GIFTS System Calibration Requirements Flowdown"

Similar presentations


Ads by Google