Presentation is loading. Please wait.

Presentation is loading. Please wait.

POLITEKNIK KOTA KINABALU

Similar presentations


Presentation on theme: "POLITEKNIK KOTA KINABALU"— Presentation transcript:

1 POLITEKNIK KOTA KINABALU
SISTEM MAINHOLE DAN PROSES RAWATAN AIR KUMBAHAN Zon 1 Zon 2 Zon 3

2 SISTEM MAINHOLE ZON 1

3 SISTEM MAINHOLE ZON 2

4 SISTEM MAINHOLE ZON 3

5 PROSES RAWATAN AIR SISA
ZON 1 ZON 2 ZON 3

6 SEWERAGE TREATMENT PLANT
Zon 1 POPULATION EQUIVALENT ( PE ) = PE KAWASAN TERLIBAT 15 BLOK KAMSIS PUSAT ISLAM CAFETERIA Zon 2 POPULATION EQUIVALENT ( PE ) = PE CORE A CORE B JKA JKE JKM Zon 3 POPULATION EQUIVALENT ( PE ) = PE KUARTERS Sistem Berfungsi Secara Automatik Setiap 4 jam

7 SECONDRY CLARIFIER JUNCTION BOX LAST MAINHOLE DISTRIBUTION CHAMBER EFFLUENT SCREEN CHAMBER JUNCTION BOX PUMP SUMP SLUDGE HOLDING TANK FINE SCREEN AERATION TANK BALANCING TANK DISTRIBUTION CHAMBER

8 STP ZON 1 PIPING LAYOUT PLAN POLITEKNIK ‘PASS’ 3600 P.E
ALIRAN AIR MASUK PAIP ANGIN RETURN PIPE PAIP AIR BUANGAN (YANG TELAH TERAWAT)

9 STP ZON 2 PIPING LAYOUT PLAN POLITEKNIK ‘PASS’ 1400 P.E
ALIRAN AIR MASUK PAIP ANGIN RETURN PIPE PAIP AIR BUANGAN (YANG TELAH TERAWAT)

10 STP ZON 3 PIPING LAYOUT PLAN POLITEKNIK ‘PASS’ 1500 P.E
ALIRAN AIR MASUK PAIP ANGIN RETURN PIPE PAIP AIR BUANGAN (YANG TELAH TERAWAT)

11 JENIS DAN KAPASITI PAM YANG DIGUNAKAN DALAM SISTEM RAWATAN AIR KUMBAHAN DI POLITEKNIK KOTA KINABALU.
BLOWER PUMP POWER 18.5 KW ZON 1, ZON 2 DAN ZON 3 2 BLOWER (CONTROL ROOM) MEMBEKALKAN OKSIGEN KE BALANCING TANK, AERATION TANK DAN SECONDRY CLARIFIER. BEROPERASI SECARA AUTOMATIK SETIAP 4 JAM (TIMER CONTROL) OKSIGEN DIBEKALKAN UNTUK MENGAWAL NILAI PH & BOD

12 PUMP SUMP POWER 6 KW ZON 1 DAN ZON 2
BEROPERASI SERACA OUTOMATIC SETIAP 4 JAM (TIMER CONTROL) MEMPUNYAI 4 SENSOR PERINGKAT : 1) STANDBY 2) 1 PAM 3) 2 PAM (HIGH LEVEL) 4) ALARM RING

13 TRANSFER PUMP POWER 102 KW ZON 1
BEROPERASI SECARA OUTOMATIC SETIAP 4 JAM (TIMER CONTROL) MEMPUNYAI SENSOR MENYALURKAN AIR BERLEBIHAN KE AERATION TANK

14 KUALITI ALAM SEKITAR YANG DIBENARKAN DI BAWAH AKTA 1974 (purata yang terdapat dalam ‘Operation Manual’) PH VALUE = 5.5 to 9.0 BOD = 20 mg / I SS = 50 mg / I


Download ppt "POLITEKNIK KOTA KINABALU"

Similar presentations


Ads by Google