Presentation is loading. Please wait.

Presentation is loading. Please wait.

! Courtesy: Art Mollica, St Paul Power & Sail Squadron

Similar presentations


Presentation on theme: "! Courtesy: Art Mollica, St Paul Power & Sail Squadron"— Presentation transcript:

1 ! Courtesy: Art Mollica, St Paul Power & Sail Squadron
Chapter 3 – 1 RW OR Mo (A) ! R N “6” R “4” Q R G C “5” G “3” BELL Rks Rocky Neck Pt rky N “2” N “4” TOWER Gp Fl (2) 10s 23ft 10M E Int 6s 40ft Qk Fl 20ft Lts in line 245o OYSTER RIVER RANGE 22FT Swan Pt TANK B l a c k f I s h C r e e k G C “11” G C “13” R “2” Fl R 4s G “1” Fl G 2s G “15” Fl G 4s G “9” C “3” C “1” RW “BC” CHIMNEY Haven Bluff G “7” (Aband Lt Ho) GONG Kelp Fl R 6s 24ft 5M “4” Fl G 6s 24ft 5M “3” C “7” N ”6” SPIRE Bkw Perkins Cove R “6” R “8” I Q R Q R Wd Foul Duttons I Fl 8s 42ft 8M COL REG DEMARCATION LINE RG ”D” Fl(2+1)R” Cable Area SD Fl 8s 20ft 5M Channel I R Lt SOUNDINGS IN FEET At Mean Lower Low Water Cl Sh Mud stk hrd St Scale: 1:115,000 Ruins Fl R 6s 40ft 10M HORN North American Datum of 1983 (World Geodetic System 1984) N a u t I c a l M I l e s Chapman Pt Fl 6s 126ft 18M FIXED BRIGE HOR CL 1800 FT VERT CL 135 FT (Center Span) SECURITY ZONE note A) (see C “1’ R ”10” R N “14” RG “CP” Fl (2+1) R 6s R “16” 40’ 55’ 50’ 45’ 05’ 72o 00’ 41o 35’ Courtesy: Art Mollica, St Paul Power & Sail Squadron (1) 0900 Heading TC = Var = 15W (3) 0951 Bearing CB = Dev = 0 (heading) MB = Var = 15W TB = 245 310M Draw the 0926 LOP to intersect this point C 099M MC = 370 – 360 = 010 Dev = CC = 010 41o 42.7’N 0951 RFix S 12 0951 0951 260M Measure distance between DR’s Move the 0926 LOP this distance along DR track 0926 (2) 0926 Bearing CB = Dev = 0 (heading) MB = Var = 15W TB = 295 (3) 0951DR D=ST/ D=(6.0x51)/60 D= 5.1nm 310M 0926 S 6.0 C 010M (4) 0951 Heading TC = Var = MC = Dev = CC = 084 0900 (2) 0926DR D=ST/ D=(6.0x26)/60 D= 2.6nm 15W 099 099 072o 01.6’W


Download ppt "! Courtesy: Art Mollica, St Paul Power & Sail Squadron"

Similar presentations


Ads by Google