Presentation is loading. Please wait.

Presentation is loading. Please wait.

INSPIRE MIG-T MIWP-16 activity report.

Similar presentations


Presentation on theme: "INSPIRE MIG-T MIWP-16 activity report."— Presentation transcript:

1 INSPIRE MIG-T MIWP-16 activity report

2 Activities over the past two years Automated monitoring Dashboard
Outline Mandate Activities over the past two years Automated monitoring Dashboard Changes proposed Open issues Final steps foreseen

3 Commission Decision 2009/442/EC Yearly monitoring
INSPIRE Monitoring Decision Commission Decision 2009/442/EC Yearly monitoring List of datasets falling under INSPIRE and related services Indicators about (non exclusive list): Metadata (existence, conformity, accessibility) Conformity of spatial datasets and services Accessibility of datasets through services

4 Under MIG/MIWP-16 MIWP-16 Mandate
Review of the monitoring indicators (relevance and automatability) and propose updates Development of tools to generate the monitoring data from the national discovery service endpoint Prototype of a dashboard to visualize the monitoring information

5 Study of the automatability of indicator variables
Activities over the past two years (1) Survey to collect feedback from MS about indicators and needs for a dashboard Study of the automatability of indicator variables Drafting of specifications for the development of tools to automate the monitoring and to visualize the monitoring variables and indicators

6 Development of the prototypes
Activities over the past two years (2) Development of the prototypes Identification of additional optional elements to be collected Identification of indicators proposed to be dropped/added Identification of open issues Drafting of final activity report MIG Wiki > Status reports of on-going MIWP actions > MIWP-16_final_report_draft_ docx

7 Mapping between metadata and monitoring variables (see report)
Automated monitoring Mapping between metadata and monitoring variables (see report) theoretical practical implementation Prototype tools developed Used for official monitoring in 2015 by some Member States

8 Automated monitoring- harvesting

9 Automated monitoring - monitoring generation

10 Upload the XML file to Reportnet
New Workflow to Prepare, Deliver Monitoring Generate a XML monitoring file automatically out of national catalogues Review the indicators automatically calculated and possibly proceed to updates in the catalogue (in which case, rerun 1) Load and edit the XML file into the webform application. Save the modified XML file. Upload the XML file to Reportnet

11 INSPIRE Monitoring Dashboard
Prototype publicly available at Used to produce charts in the presentation about INSPIRE implementation in EU MS made at the 2015 INSPIRE conference

12 INSPIRE Monitoring Dashboard - Landing page

13 INSPIRE Monitoring Dashboard - Maps

14 INSPIRE Monitoring Dashboard - NS in 2014

15 INSPIRE Monitoring Dashboard - Raw data

16 Changes Proposed Non-mandatory additional elements to be reported for data sets and/or services Metadata UUIDs of spatial data sets Metadata UUIDs of the discovery, view and download services related to a spatial data set Metadata UUID of the discovery service servicing the metadata of a network service. Direct accessibility of a service

17 Indicators proposed to be discarded
Changes Proposed Indicators proposed to be discarded DSi1: Geographical coverage of spatial data sets NSi3: Use of network services Indicators proposed to be discarded if full automation MDi1: Existence of metadata NSi1: Accessibility of metadata through discovery services

18 Indicator to be added Changes Proposed
Indicator on spatial data service (similar to the indicators existing for discovery, view, download, transform and invoke services) Updated MD TG from MIWP-8 will clarify the process of identifying spatial data services from metadata.

19 Maintenance of "prototypes"/production systems
Open Issues Proposed modifications require an update of the Commission Decision and the corresponding guidance documents Maintenance of "prototypes"/production systems New understanding of SDS (currently reviewed by MIG-T)

20 Information about direct accessibility of services
Open Issues Information about direct accessibility of services Usefulness of indicator DSi2 (conformity of spatial data sets) Not all INSPIRE relevant data can be transformed according to INSPIRE data models

21 Dissolve MIWP-16 group at the end of 2015
Final Steps Foreseen Release of final version of the activity report (fix typographic mistakes, use correct template) next week Dissolve MIWP-16 group at the end of 2015 Thank you to all MIWP-16 members for their great level of involvement and expertise


Download ppt "INSPIRE MIG-T MIWP-16 activity report."

Similar presentations


Ads by Google