Download presentation
Presentation is loading. Please wait.
1
Feed horn array sub-system for QUBIC
For Technological Demonstrator (T.D.) And For Final Instrument (F.I.) QUBIC Collaboration Meeting, January 18/19, Milano
2
QUBIC Collaboration Meeting, January 18/19, Milano
People involved (UniMi) Francesco Cavaliere (head of machine shop, mechanical supervision) Federico Pezzotta (mechanical assembly, top and bottom flange production, metrological measurements, interface with manufacturer) Daniele Viganò (mechanical support) Paola Battaglia (metrological measurements, support to electromagnetic tests, electromagnetic simulations) Elenia Manzan (MSc student, metrological measurements and analysis, electromagnetic simulations) Aniello Mennella (scientific supervision, responsible for UniMi) QUBIC Collaboration Meeting, January 18/19, Milano
3
QUBIC Collaboration Meeting, January 18/19, Milano
8x8 module for T.D. 8x8 module for T.D. QUBIC Collaboration Meeting, January 18/19, Milano
4
QUBIC Collaboration Meeting, January 18/19, Milano
8x8 Horn Arrays: Status Design: Completed Manufacturing: Completed Assembly: Almost completed Modules A and B already assembled, but using different strategies. Final decision to be taken based on EM test results. Test: In progress UNIMI Metrology report on platelets available (16/02/2016, P.Battaglia et al.) Metrological tests also performed on assembled modules (flatness). Should be repeated upon final assembly. EM tests: on-going in Milano-Bicocca QUBIC Collaboration Meeting, January 18/19, Milano
5
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
6
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
7
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
8
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
9
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
10
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
11
QUBIC Collaboration Meeting, January 18/19, Milano
Horn mechanical development QUBIC Collaboration Meeting, January 18/19, Milano
12
QUBIC Collaboration Meeting, January 18/19, Milano
Metrological inspections: Platelets Mechanical measurements performed at UniMi with WERTH Scopecheck metrological machine Verify that platelets are produced within required tolerance Problem identified with 8x8 module due to etching time – will be corrected for final module QUBIC Collaboration Meeting, January 18/19, Milano
13
QUBIC Collaboration Meeting, January 18/19, Milano
Metrological inspections: Platelets Module n. 1 QUBIC Collaboration Meeting, January 18/19, Milano
14
QUBIC Collaboration Meeting, January 18/19, Milano
Metrological inspections: Platelets Module n. 2 QUBIC Collaboration Meeting, January 18/19, Milano
15
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on return loss - simulations Return loss at 150 GHz for three selected horns compared to nominal and requirement (module 1) QUBIC Collaboration Meeting, January 18/19, Milano
16
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on return loss - simulations Return loss at 150 GHz for three selected horns compared to nominal and requirement (module 2) QUBIC Collaboration Meeting, January 18/19, Milano
17
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on return loss – simulations and meas. Return loss at 150 GHz – comparison between simulations and measurements QUBIC Collaboration Meeting, January 18/19, Milano
18
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on beam pattern - simulations QUBIC Collaboration Meeting, January 18/19, Milano
19
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on beam pattern - simulations H plane 150 GHz QUBIC Collaboration Meeting, January 18/19, Milano
20
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on beam pattern - simulations QUBIC Collaboration Meeting, January 18/19, Milano
21
QUBIC Collaboration Meeting, January 18/19, Milano
Effect on beam pattern - simulations QUBIC Collaboration Meeting, January 18/19, Milano
22
QUBIC Collaboration Meeting, January 18/19, Milano
Tolerance problem on 8x8 8x8 prototype shows an out-of-spec problem on platelet diameters This was not present on previous 2x2 prototypes Discussions with manufacturer point to a possible problem in the chemical etching process (QUBIC platelets were etched typically at the end of the day, when the acid was somewhat exausted) Problem not expected in final instrument horns: manufacturer will deliver platelets only after internal assessment of tolerance Main effect on return loss, minor effect on beam pattern Should not be an issue for technological demonstrator, will not be an issue for final instrument QUBIC Collaboration Meeting, January 18/19, Milano
23
QUBIC Collaboration Meeting, January 18/19, Milano
Metrological inspections: Flatness Horn modules A and B have been assembled using different strategies: Module A: Torque on screws recursively adjusted to improve flatness of top surface. Flatness achieved: mm Module B: All screws fixed once at nominal torque value (0.8Nm) Flatness achieved: mm QUBIC Collaboration Meeting, January 18/19, Milano
24
QUBIC Collaboration Meeting, January 18/19, Milano
module for F.I. module for F.I. QUBIC Collaboration Meeting, January 18/19, Milano
25
QUBIC Collaboration Meeting, January 18/19, Milano
Horn Arrays: Status Design: Almost completed Platelets: design is already fixed Top and bottom flanges: discussion on-going with Switches team to finalize the design (Horns-Switches interfaces, alignment options). Few candidates left, could be fixed by the end of this meeting. Manufacturing: In progress Platelets are currently being manufactured by chemical etching. Delivery expected by the end of February 2017 CAD-CAM conversion and manufacturing of top and bottom flanges could start upon final design choice M3 Ergal screws have already been delivered. QUBIC Collaboration Meeting, January 18/19, Milano
26
QUBIC Collaboration Meeting, January 18/19, Milano
Horn Arrays: Status Assembly: To follow Critical steps of the assembling procedure were assessed with 8x8 horn array 20x20 will be larger, heavier, with many more screws: the task will be more difficult and will require more time An optimized assembling strategy should be planned in advance based on current experience. Custom equipment may be required. Test: To follow Metrological inspection on 8x8 included all horns and all platelets Preparing and performing all the measurements required more than one month A more efficient strategy could be considered for the 20x20 (e.g. a subset of complete horns in relevant positions of the array). QUBIC Collaboration Meeting, January 18/19, Milano
27
QUBIC Collaboration Meeting, January 18/19, Milano
Design: Platelets Each sheet can hold 4 platelets. Total amount of metal sheets: 352 QUBIC Collaboration Meeting, January 18/19, Milano
28
QUBIC Collaboration Meeting, January 18/19, Milano
Manufacturing: Platelets First samples available (4 sheets): spot checks on horn holes dimensions revealed compliance with expected tolerances. QUBIC Collaboration Meeting, January 18/19, Milano
29
QUBIC Collaboration Meeting, January 18/19, Milano
Design: Flanges Top flange (right): design is already fixed Bottom flange (left): design in almost completed. Interfaces and alignment choices with the switches block will drive the final solution (discussion is on-going on theese topics among Milano, Milano-Bicocca and APC). QUBIC Collaboration Meeting, January 18/19, Milano
30
QUBIC Collaboration Meeting, January 18/19, Milano
Delivery dates: for Technological Demonstrator Project Number Resp. Item Task Start after task # Can start at Completion of fab / test and delivery at 112 Milano-B Horns Tests at Ghz of 8x8 - Started 20/01/17 119 Milano / Milano-B B2B H+S assembly 112 / 118 03/04/17 07/04/17 QUBIC Collaboration Meeting, January 18/19, Milano
31
QUBIC Collaboration Meeting, January 18/19, Milano
Delivery dates: for Full Instrument Project Number Resp. Item Task Start after task # Can start at Completion of fab / test and delivery at 162 Milano horns Fabrication and assembly Started 08/03/17 163 Milano-B Test 09/03/17 04/10/17 167 Milano / Milano-B H+S B2B Assembly 163 / 166 02/11/17 15/11/17 QUBIC Collaboration Meeting, January 18/19, Milano