Engineering Project Tendering
2
General principles in tendering
Money and time Economic use of resources Contractor’s contribution to design and contract Production cost savings Continuity Risk
3
Preliminary enquiry(before Tendering)
Letter to the potential selected contractors asking them whether they are interested to tender Typical information provided including Employer, Consultants, Location of site, General description of works Date of return,…and etc
4
Tender period Ample time must be allowed
Depend on any addendum will be issued Normally four weeks should be allowed
5
Tender Documents Bills of quantities Drawings Form of tender
An addressed envelope for the return of the tender Information and instructions for tendering
6
Information and Instructions for tendering
Date and time for the return of tender Place where all other drawings may be inspected Arrangements for site inspection Time and place of opening of tenders Instruction that contractors are to acknowledge receipt of all documents
7
Receipt of tender The tenders should be opened in the scheduled time in the presence of employer’s and consultant’s representatives Tender prices of the tenders are recorded. Consultants should carry out tender appraisal subsequently
8
Question and Answer The lowest three or four tenders would be analyzed
Tenders would be asked to qualify or withdraw the qualification of some unclear items Tender interviews would be hold amongst the client’s and consultants’ representative, and tenderer one by one
9
Report on tenders and acceptance
Tenderer would be recommended based on the price, planning, programme, financial, capability and competence Contractor would be appointed upon client blessing is obtained Letter of intent would be issued to the contractor
10
Tendering method Open Competitive Tendering
Selective Competitive Tendering Negotiated Tendering
11
Competition and negotiation
The relationship between competition and negotiation When to negotiate The basis for negotiation How to negotiate
12
Competition Price Quality Design Management Time
13
Advantages of competition
Accountability A true reflection of current market prices Quotations easily define and measure contract period, design and management
14
Disadvantages of competition
A waste of resources Restriction on full communication between design team and tenderers on details The lowest tender price may be much greater than the cost plan
15
Negotiation Pre-contract negotiation Post-contract negotiation
16
Situations adopted Negotiation
Business relationship Contractor-financed projects Continuation of contract Special circumstances Special expertise or equipment Tendering climate Quick start
17
Basis for negotiation Competitive price for similar work under similar conditions in another or previous contract An agreed assessment of the estimated cost plus percentage of overheads and mark up
18
How to negotiate Equality of negotiators Parity of information
Structure of estimate Apportionment of cost
19
Advantages of negotiation
Save time Full communication Progressive agreement is feasible Elimination of many claim items
20
Disadvantages of negotiation
Possible unnecessary higher price Loss of time if unsuccessful Lack of accountability
21
Non-traditional arrangements
The work is not to be quantified and measured in a bill of quantities Information for the contractor to carry out the work is same as traditional arrangement
22
Advantages of quantities system
Risk is lower for the contractor Competition is fairer Lower tenderers’ overheads during tendering Allow the total price to be analyzed in great detail Best means of cost control
23
Disadvantages of quantities system
Design must be substantially complete for measurement For small jobs, it is inefficient Some quantities are partially speculative
24
Specification-based documentation
Normal specification-based contracts Performance specifications
25
Review The advantage of competitive tendering is?
Restriction on full communication between design team and tenderers on details and site operations Resource in preparing several unsuccessful tenders can be avoided. The lowest tender price may be much greater than the cost plan Contract period, design and management can be easy to define and measure