CIM Test Development Process
John Simmins Weekly Status and Planning Meeting 4/12/2011
2
Agenda Progress since last meeting
Issues, opportunities and risks arising during the previous week Verify progress against stakeholder expectations General issues discussion Action items for individuals Expected work output during next week Standing agenda 2
3
Progress Since Last Call
Sample vender package for outage test procedure Single file with all data needed Designed for venders to participate in dry run Specific test steps for each system under test OMS MDMS Head End Still needed Vetted sample outage message Instructions to create outage Test system login Summary of recent activities and of the test procedures 3
4
Progress Since Last Call
Sample / Instance example Outage message created Issues noted Shawn Hu from eXtensible created outage message Discuss later in briefing Summary of recent activities and of the test procedures 4
5
Instance Sample Outage Message Header —Shawn Hu
<?xml version="1.0" encoding="UTF-8"?> <CreatedEndDeviceEvents xsi:schemaLocation=" EndDeviceEventsMessage.xsd" xmlns=" xmlns:obj=" xmlns:msg=" xmlns:xsi=" <Header> <msg:Verb>created</msg:Verb> <msg:Noun>EndDeviceEvents</msg:Noun> <msg:Context>TESTING</msg:Context> <msg:Timestamp> T10:00:00Z</msg:Timestamp> <msg:Source>HE-001</msg:Source> <msg:ReplyAddress>Not Applied</msg:ReplyAddress> <msg:AckRequired>true</msg:AckRequired> <msg:MessageID>ABC-123</msg:MessageID> <msg:CorrelationID></msg:CorrelationID> <msg:Comment>created end device events for testing</msg:Comment> </Header>
6
Instance Sample Outage Message Payload —Shawn Hu
<Payload> <obj:EndDeviceEvents> <obj:EndDeviceEvent> <obj:createdDateTime> T09:30:30Z</obj:createdDateTime> <obj:reason>Electric Meter Power Out</obj:reason> <obj:Assets> <obj:mRID>3dc53ee5-777e-50b a1c224f45f3d</obj:mRID> <obj:Names> <obj:name>Meter23253</obj:name> </obj:Names> </obj:Assets> <obj:EndDeviceEventType ref=" "></obj:EndDeviceEventType> <obj:status> <obj:dateTime> T08:35:47Z</obj:dateTime> <obj:value>Electric meter power out</obj:value> </obj:status> </obj:EndDeviceEvent> </obj:EndDeviceEvents> </Payload>
7
Outage Message Plan to move forward
Start with Instance/Sample message Describe content/format as required Include in vender package Review and vet message with venders as required OMS MDMS Head End Meter
8
Open Action Items Assignee Action Status John Simmins
Work with internal resources to separate lab network completely from the EPRI operational network. COMPLETED Mark Ortiz Provide written procedures on access to Consumer’s DMZ network and server In process Kay Stefferud Contract Mark Ortiz to request written procedures to access the Consumers server. Margaret Goodrich Review sample abstract test case. Send Kay excel spreadsheet with test set-up information. Status of action items generated from each weekly meeting. We can discuss status now or else please send an to the group with the completed action item information. 8
9
Expected Work Output During the Next Week
Meeting with Consumers (Mark) and EnerNex (Kay) Consumer server login process Continue Sample Messages Sample message from IOP would be helpful Process to connect multiple test sites needs to be dry run 9
10
Together…Shaping the Future of Electricity