B104 Lab Monitoring Remediation Project

Similar presentations


Presentation on theme: "B104 Lab Monitoring Remediation Project"— Presentation transcript:

1 B104 Lab Monitoring Remediation Project
Project Update February 18, 2010

2 Project Overview 1)Yokogawa chart recorders have a history of deviations in the labs. 2) Periodic Review of B104 automated LEQMS identified gaps to remediate. DEVIATION REDUCTION: Temperature and humidity data loss from paper chart recorders, missed daily checks. PROCESS IMPROVEMENT: Paper chart recorders require daily checks, change out of paper, fixing paper jams, storing of paper charts in GMP library. (fan the paper) Change: Upgrade paper chart recorders for temperature and humidity monitoring of approximately 80 pieces of lab equipment and rooms for all of B104. Decommission (paper chart recorders) and (LEQMS) system as a result of upgrade.

3 Yokogawa DX230P (DAQSTATION) Paperless Recorders
System Yokogawa DX230P (DAQSTATION) Paperless Recorders Area No. of Units/Monitored Equipment & Locations LEMS41 - B104 / Basement (Media Prep) 1/11 LEMS42 - B104 /1 (Chemistry) 1/26 LEMS43 - B104/2 (Purity, Development, Endotoxin) 1/25 LEMS44 - B104/2 (Potency, ID) 1/12 LEMS45 - B104/3 (Sterility, Micro Water Lab, Particulates) 1/19 Total Units/Locations 5/93

4 Remote Alarm Notification (Win-911)
System Remote Alarm Notification (Win-911) Area No. of Alarms Monitored/Responders LEMS41 - B104 / Basement (Media Prep) 20/2 LEMS42 - B104 /1 (Chemistry) – 3 shifts 30/10 LEMS43 - B104/2 (Purity, Development, Endotoxin) 48/9 LEMS44 - B104/2 (Potency, Micro-ID) 22/5 LEMS45 - B104/3 (Sterility, Micro Water Lab, Particulates) 32/8 System - Automation Total Alarms/Responders 152/34

5 Monitoring

6 LEMS System Overview

7 LEMS System Overview

8 Project Details Total Budget: $224,000
Documents : 19 (Req; Des; Test Plan, Maint Strategy, etc.) Test Cases Developed/Executed: 12/~ 100 Procedures/Tools Updated/Created: 1/8 Summary Reports: 2 (1 Test; 1 Val plan) Systems to be Retired: (7)-Yokogawa paper chart recorders & Automation (LEQMS)

9 Risk Mitigation Strategies
Risk Assessment and Equipment FMEA executed. All Testing done online with new LEMS production system. Extensive Training: >100 Individuals received Data Historian LL training; Vendor (Yokogawa) onsite and Lilly project members setup and trained each Area of Labs.

10 Lessons Learned/Issues Resolved
DAQSTATION – Alarms do not latch DAQSTATION –Alarm Acknowledge status not available to pass on via Kepware (Win-911 unable to stop calls if alarm acknowledged locally) B104 Network impacted – IAT process did not flush out connectivity issues Remote notification hardware unable to perform in Virtual Server environment Integration between Parenteral engineering and labs - language, terminology, business practices and procedures handled differently.