ACEC of Arizona & ADOT Liaison Todd A. Emery, PE
Deputy State Engineer, Design Arizona Department of Transportation June 6, 2018
2
Arizona Management System (AMS)
ADOT utilizes the AMS as a way of doing business. It’s our culture. Measurements are an important part of the AMS We embrace measurements as a tool to help us improve. Measurements help us know if our mission is being accomplished.
3
ADOT Scorecards
4
MAP-21 Performance Measures
USDOT required to set performance measures in the following areas: Pavement condition and performance on the interstate system and on the remainder of the National Highway System (NHS) Bridge condition on the NHS Fatalities and serious injuries – both number and rate per vehicle mile traveled – on all public roads Traffic congestion On-road mobile source emissions Freight movement on the interstate system States are required to set targets in support of those measures ADOT set these targets as of May 20, 2018 (Exception is Safety Targets)
5
Safety Measures Safety Measures
Number of Fatalities: Rate of Fatalities: Number of Serious Injuries: Rate of Serious Injuries: Non-motor Fatalities & Serious Injuries: Set every June in coordination with the GOHS and the MPO’s Based on a 5yr rolling average Measures include all public roads First targets set in 2017 for Calendar year 2018. Targets are set annually
6
2018 Projections (Targets) Status
As reported - Aug 2017 Update 2016 Baseline 2018 Projections (2017 Original) 2017 Actual 2018 Projections (2018 Update) Actual 5-yr avg. Chg. Annual % Act PRELIM PASS/ FAIL S1 – Fatalities 966 860.6 4 1,040 934.6 1001 5.1% 894.6 1,052.5 935.3 X S2 – Fatality Rate* 1.439 1.364 2 1.525 1.412 1.441 2.5% 1.372 1.478 1.388 √ S3 – Serious Injuries 4,515 4,291.60 4,330.0 4,111 -9.0% 4,213.40 -1.6% 4,046.5 4,157.1 S4 – Serious Injury Rate* 6.753 6.818 -1 6.62 6.551 5.918 -11.2% 6.487 -4.4% 5.681 6.194 S5 – Non-Motorized 854 720.4 889 790 821 -4.9% 742 2.8% 845.6 773.1
7
Proposed 2019 Projections 2017 Actual 2019 Projections (2018) 2017 Annual Annual Change 5-yr Avg. Change Projected Annual Projected S1 – Fatalities 1001 5.1% 4.3% 5% 1105.1 1001.5 S2 – Fatality Rate* 2.610 2.5% 1.4% 2% 1.507 1.442 S3 – Serious Injuries 4,111 -9.0% -1.6% -1% 4006.0 4166.9 S4 – Serious Injury Rate* 5.918 -11.2% -4.4% -4% 5.454 6.022 S5 – Non-Motorized 821 -4.9% 2.8% 3% 871.0 813.9
8
Pavement Performance Measures
Four national performance measures: % of Interstate Pavements in Good Condition % of Interstate Pavements in Poor Condition % of Non-Interstate NHS Pavements in Good Condition % of Non-Interstate NHS Pavements in Poor Condition Interstate pavements require 4-year targets Non-Interstate NHS pavements require 2- and 4-year targets 4-year targets may be adjusted at the 2-year performance period progress report MPOs must support the state targets or establish their own targets within 180 days of State target establishment
9
Interstate Highways Year Good (%) Fair (%) Poor (%) 2010 72.16 27.82
0.02 2011 69.38 30.62 0.00 2012 73.44 26.55 2013 68.82 31.17 0.01 2014 60.89 38.96 0.15 2015 62.62 37.29 0.08 2016 63.93 36.05
10
(does not include local NHS)
Non-Interstate NHS (does not include local NHS) Year Good (%) Fair (%) Poor (%) 2010 68.07 31.91 0.02 2011 67.16 32.78 0.06 2012 67.94 32.04 0.01 2013 63.43 36.54 0.04 2014 56.15 43.60 0.25 2015 53.56 46.26 0.18 2016 52.60 47.15 0.24
11
Pavement Performance Targets
% of Interstate Pavements in Good Condition (2016 = 63.93%) 4-year target – 48% good % of Interstate Pavements in Poor Condition (2016 = 0.02%) 4-year target – 2% poor % of Non-Interstate NHS Pavements in Good Condition (2016 = 52.6%) 2- and 4-year targets – 31% good % of Non-Interstate NHS Pavements in Poor Condition (2016 = 0.24%) 2- and 4-year targets – 6% poor
12
Bridge Performance Measures
Two national performance measures: % of NHS Bridges Classified as in Good Condition (based on deck area) % of NHS Bridges Classified as in Poor Condition (based on deck area) ADOT must establish 2- and 4-year targets by for both measures 4-year targets may be adjusted at the 2-year performance period progress report MPOs must support the state targets or establish their own targets within 180 days of State target establishment
13
Historical Trends Bridge Condition (Deck Area) NHS Good (%) Fair (%)
Program Amount Local Fund NHS Good (%) Fair (%) Poor (%) Millions 2013 57.0 39.2 3.8 20 3.9 2014 56.7 39.4 40 2015 56.8 39.9 3.3 60 2016 56.4 41.1 2.5 2017 42.0 1.6 Bridge Condition (Deck Area) NHS State/ Local% Good (%) State Local Fair (%) Poor (%) 2013 87/13 59.4 40.8 36.5 56.7 4.1 2.5 2014 58.9 42.3 37.0 55.2 2015 93/7 57.8 42.4 38.7 56.0 3.5 1.6 2016 91/9 57.1 48.7 40.2 50.5 2.7 0.8 2017 58.2 39.3 59.9
14
Bridge Performance Targets
% of NHS Bridges Classified as in Good Condition (based on deck area) 2- and 4-year targets – 52% good % of NHS Bridges Classified as in Poor Condition (based on deck area) 2- and 4-year targets – 4% poor
15
Non-Single Occupancy Vehicle Travel
Includes carpool, transit, walking, biking and telecommuting Applies to urbanized areas of more than 1 million people that are also nonattainment or maintenance for ozone, carbon monoxide or particulate matter States and applicable MPOs must coordinate on unified 2- and 4-year targets Based on data from the U.S. Census Bureau (American Community Survey)
17
Non-SOV Travel Targets
Measure: Percent of non-SOV travel for the entire urbanized area Targets: 2-year – 22.9% 4-year – 22.6%
18
Annual Person-Hours of Peak Hour Excessive Delay
Applies to urbanized areas of more than 1 million people that are also in nonattainment or maintenance areas (CO, O3, PM) for the first performance period States and applicable MPOs must coordinate a unified 4-year target Threshold: Travel time at 20 mph or 60% of the posted speed limit for each reporting segment, whichever is greater Reported per capita for the urbanized area
20
Peak Hour Excessive Delay Target
Measure: Annual Hours of Peak Hour Excessive Delay per capita Target: 4-year – 10.9 hours
21
Freight Reliability Uses the annual Truck Travel Time Reliability (TTTR) Index TTTR ratio: 95th percentile travel time divided by normal travel time (50th percentile) – TTTR Index is then calculated using the TTTR ratio for each segment, segment lengths, and total Interstate length. 2- and 4-year targets required: 4-year target may be adjusted at the 2-year performance period progress report MPOs must support the state targets or establish their own targets within 180 days of State target establishment
23
Freight Reliability Target
Measure: Truck Travel Time Reliability on the Interstate Targets: 2-year – 1.21 4-year – 1.23
24
NHS Travel Time Reliability
Travel time reliability on the Interstate and the Non-Interstate NHS measured as a percent of person miles traveled 2- and 4-year targets for the Interstate 4-year target for the non-Interstate NHS MPOs must support the state targets or establish their own targets within 180 days of State target establishment
27
NHS Travel Time Reliability Targets
Measure: Percent of person-miles traveled that are reliable on the Interstate 2-year – 86.0% 4-year – 85.8% Measure: Percent of person-miles traveled that are reliable on the non-Interstate NHS 4-year – 74.9%
28
CMAQ Performance Measure
Total Emissions Reductions Nonattainment and Maintenance Areas for Carbon Monoxide, Ozone, and Particulate Matter (2 & 4 year targets) Method Total emissions reduction is calculated by summing the 2 & 4 year totals of emission reductions of applicable criteria pollutant and precursor, in kilograms per day, for all projects funded with CMAQ funds.
30
CMAQ Performance Targets
Targets (kg/day) VOC CO NO x PM-10 PM-2.5 2-year target (FY ) 210 3720 418 873 69 4-year target (FY ) 385 6985 761 1399 112
31
What Happens If ADOT Does Not Meet the Targets?
Safety Targets Need to meet 4 out 5 targets or show substantial progress – (funds) Pavement Targets No more than 5% of lane miles of the interstate shall be in poor condition -(funds) Bridge Targets NHS bridges total deck area cannot have more than 10% classified as structurally deficient – if this happens for 3 consecutive years - (funds) All Targets If targets are not met in year 4 (2021) then a plan needs to be put together on how the state will work towards meeting the targets. Typically Targets can be adjusted in year 2 (Safety is adjusted yearly) as part of the reporting that is done.
32
Thank You Questions?