Download presentation
Presentation is loading. Please wait.
Published byLoreen Townsend Modified over 6 years ago
1
Dredging Operations Low Water Dredging Operations:
The Potter (U) remains on stand-by at the St. Louis District Service Base 177 UMR for future drought-related dredging. The America (C) is on stand-by at Kaskaskia River 117 UMR for future drought-related dredging. The Hurley (U) remains on stand-by at the Memphis District Ensley Engineer Yard 725 LMR for future drought-related dredging. The Jadwin (U) remains on stand-by at the Vicksburg Harbor LMR for future drought-related dredging. Dredge Potter Dredge America Dredge Hurley Summary: 4 dredges are currently on stand-by for drought-related dredging along the Upper Mississippi River between St. Louis, MO, and Cairo, IL. 3 USACE Dredges 1 Contract Dredge POC: Michael Kidby Phone #: (C) Location: HQUSACE As of: 27 FEB 2013 Dredge Jadwin Legend: USACE Dredge (U) – Contract Dredge (C) – Navigability Legend: Open Restricted Closed As of 27 FEB 2013 As of: 20 November 2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.