Download presentation
Presentation is loading. Please wait.
Published byLee Lucas Modified over 6 years ago
1
City of San Mateo WWTP Site Layout for newly constructed Headworks and BNR/MBR in lot across from current plant.
2
Flow and Loading design specifications for new facility liquid train.
3
Dry Weather Operating Mode
4
Wet Weather Operating Mode
5
Newly Commissioned CNG Production and Fuel Dispensing Facility
Capacity of 100 scfm/min biogas flow to produce ~40 scfm/min >95% CH4 -CNG meets SAE J1616 vehicle fueling standard -treatment skid removes particulates, siloxanes, H2S and CO2 Prepares and transfers purified CH4 to the compression and fueling station
6
Storage bladder has a capacity of ~50,000 scf of biogas for meeting CNG and plant demand
7
Gas drying and compression equipment can produce and dispense 300 gas gallon equivalents per day
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.