1 HYDROPOWER DEVELOPMENT
EVN HYDROPOWER DEVELOPMENT ALBANIEN

2 Catchment Area of Albanian Rivers

3 Locations of investigated rivers in southern Albania
Part of southern Albania - the capital Tirana lies about 20 km north of Elbasan

4 3D Visualization of the HPPs in Devoll River developed by EVN

5 HPPs River Devoll

6 Overview Map HPPs River Devoll

7 Devoll scheme 3 - developed by EVN
Development of HPPs developed by EVN in Albania (year 2007) Devoll scheme 3 - developed by EVN Energy Production Installed Capacity (MW) Peak Energy Production (GWh) 850 Off Peak Energy Production (GWh) 150 Total Energy Production (GWh) 1000 Investment Costs Total Construction Costs (€) Total Investment Costs (€)