Vogtle 3&4 Configuration Management
Josh Olson Configuration Management and Design Support Supervisor
2
Objectives To provide an overview of the Vogtle 3&4 Configuration Management Program current activities. Discuss future activities for the transition to a operational configuration management program
3
About the Project Received COL February 2012
First Nuclear Concrete Placed March 2013 Expected COD Unit 3 in 2017 Unit 4 in 2018
7
Vogtle 3&4 CM Program Overview
8
Information Handover Definition Process Implemented
Procedures Established Software Integration
9
Information Management Flowchart
CB&I Documentum (Charlotte) WEC EDMS (Cranberry) CB&I Site Data Center (Vogtle Site) AE FIRM Information Management System (Cranberry) SNC CM Software (Vogtle Site) SNC Maximo (Vogtle Site) SNC Documentum (Vogtle Site)
10
CIMS Software Software Requirements Implementation 2013 – Early 2014
Handover / Turnover Information Receipt & Acceptance SNC System Interfaces MEL Management Requirements Management Design Change Electronic Workflows Implementation 2013 – Early 2014
11
Master Equipment List Definition / Contents
Standard Plant / Site Specific Numbering Scheme Conversion to Maximo
12
CM Monitoring Design Oversight Compliance Monitoring Program
Design and Field Change Reviews Compliance Monitoring Program Quality Assurance Audits and Oversight Self Assessments Documentation Reviews
13
Information Turnover Developing Process
Engineering Turnover Packages (ETOPs) Information Turnover Timing Utilize Handover Efforts
14
Transition Plan CM Control during key phases of project
Descriptive / Living Document Design Authority Transfer Simulator Document / Data Management Software / Setpoint Control Cable & Raceway Information
15
Challenges EPC Contract – Information Needs Schedule Adherence
Oversight Program Development Training Procedure Development Schedule Adherence CM Conformance During Construction with a COL
16
Summary The Transition to Plant Operation Must Be Started Early
The Plant Must Be Built As Designed
17