Download presentation
Presentation is loading. Please wait.
1
Tim Pennick British Telecommunications Plc
ENABLED Enhanced Network Accessibility for the Blind and Visually Impaired Tim Pennick British Telecommunications Plc
2
ENABLED Project Partners
Queen’s University of Belfast United Kingdom Fundación LABEIN Spain Lunds Universitet Sweden Commissariat à l'énergie atomique France Tekever, lda Portugal Siemens Germany Kuratorium OFFIS e.V. Germany NetUnion Switzerland British Telecommunications Plc United Kingdom Soluziona Telecomunicaciones Spain CAS Software AG Germany Scalab Italy F.H. Papenmeier Germany
3
Work Packages 4 RTD work packages: Supported by:
Accessible Web Content Multi-Modal Adaptive Interfaces Mobile Computing Wireless Networking Supported by: User Evaluation Training Dissemination, Exploitation Project management WP2 Adaptive interfaces WP3 Mobile computing WP4 Wireless networking WP5 User Trial and Evaluation WP7 Dissemination WP6 User Training WP8 Exploitation WP9 Project Management WP1 Accessible Web contents
4
Accessibility Paradox
Information now “ubiquitous” and plentiful Leading edge developments in many areas of network technology sometimes impede access to the potentially most useful services.
5
Desktop and fixed network
ENABLED aims to: Enhance access to the web Enhance access to information on the move Information Customised Web Services IP transport network Desktop and fixed network Mobile and wireless Policy Manager User
6
Currently available interfaces
Screen magnification (for people with some residual vision) Speech synthesis (cheap and readily available) Braille display Hard-copy embossed Braille (can be used for some types of images)
7
Novel interfaces Force-feedback Haptic devices Spatial Audio
PHANToM Omni FF: 3 DoF Force-feedback Haptic devices Spatial Audio Data Sonification Audio maps
8
Requirements for Improved Web Access
Games Images graphs Maps 3-D objects
9
Requirements for Mobile Computing
1. Navigation 2. Programmable 3. Reroutable 4. Take me home 5. Obstacle Avoidance 6. Traffic Lights 7. Emergency Communications 8. Timetables 9. Orientation 10. Implicit
10
Mobile Computing Requirements filtered for Technical Feasibility
1. GPS 2. Orientation 3. Points Of Interest 4. Alternative Interfaces 5. In-door and out-door operation
11
Current Status Prototypes produced 18 month review
12
The Future Integration of prototypes Evaluation Training
13
Questions and answers Thank you for your time and interest in our project
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.