Download presentation
Presentation is loading. Please wait.
1
Enhancement Notification Release 5.4
© Ramco Systems.
2
Business Processes Maintenance Planning Engineering Line Maintenance
Shop Maintenance Sales Management © Ramco Systems. 2
3
Maintenance Planning © Ramco Systems.
4
Aircraft Maintenance Planning
Display of Task time bars based on Standard Work Timings Change Request Facility to display Task time bars based on the Standard Work Calendar timings in Planning Board Business Need Planner needs the visibility of task schedules based on the Standard Work timings of the organization in Gantt Chart Change Details Task time bars will be displayed based on the Start and end time defined in Standard Work Calendar © Ramco Systems. 4
5
Engineering © Ramco Systems. 5
6
Engineering Document Facility to generate Engineering Document based on specific attributes Change Request Facility to generate Engineering Document # based on ATA #, Eng. Doc. Type, Source Doc Type, MCR #/ Rev #, Applicability and Category Business Need Engineering Document # being generated should be based on standard attributes identified in the document Change Details New attributes added at Eng. Doc. Type level Option to choose required attributes and sequencing of attributes for document # generation can be configured © Ramco Systems.
7
Central Planning Facility to update compliance from Goods Receipt
Change Request Compliance from Good Receipt & Repair Receipt Business Need Compliance for all items received en-masse’ Change Details Filter Criteria changes in Initialize Maint. Program & Compliance © Ramco Systems. 7
8
Central Planning Facility to display contents of Block Tasks
Change Request Facility to retrieve all tasks associated to a Block Check Business Need Compliance for Heavy Check Change Details Filter Criteria changes in Initialize Maint. Program & Compliance © Ramco Systems.
9
Add Schedule Status as a Drop Down.
MCR# Schedule Status Add Schedule Status as a Drop Down. Fresh, Active, Inactive Terminated & Fresh & Active. Default with Fresh & Active Primary Task # Primary Task Desc Load all Consumption Parameters mapped. Also load 'Days' as a value. Default with BLANK Link to Track Compliance History © Ramco Systems.
10
Maintenance Programs Facility to Correct / Delete Compliance
Change Request Compliance Correction / Wipe Off Business Need Correct Incorrect compliance entries Change Details Track Maintenance History screen is modified Compliance Correction Update Compliance Delete Compliance View Corrections © Ramco Systems.
11
New Tasks for Compliance Correction & Deletion
1) New Editable Controls added. 2) Will be displayed for Compliance Correction Option. New Tasks for Compliance Correction & Deletion © Ramco Systems.
12
Maintenance Programs Features
Compliance Correction will be loaded based on access rights to Initialize Maint. Program activity Maintenance Object & Task # is mandatory for correction Original records will be moved to Compliance History tables Correction is allowed for any Complied instance. Pending tray update happens only on modification of the last compliance instance Task compliance modification will be stamped Backdated Parameter update will not change user provided compliance value Compliance Mode will displayed as Corrected Deletion of compliance is permitted only for the last instance Compliance Mode will displayed as Deleted Task will be added to due list tables © Ramco Systems.
13
Maintenance Programs Features
Correction of Previous instances will not correct the subsequent complied instances Due Dates / Values Tasks added to execution documents will not reverted back during task deletion (including maintenance evaluation) View Corrections to facilitate viewing correction information © Ramco Systems.
14
Line Maintenance © Ramco Systems. 14
15
Aircraft Maintenance Execution
Facility to Default Field Station Change Request Default Field Station in A/C Maintenance Execution Screens Business Need For Rotary Wings maintenance are carried out at specified field bases Change Details Default Work Center and Station based on the A/C Field Base mapping New Document Attributes for all Packages © Ramco Systems. 15
16
Aircraft Maintenance Execution
Facility to force user to provide Context Date Change Request Context Date in A/C Maintenance Execution should not be defaulted with current server date & time Business Need Force mechanics to provide the log card / package date & time Change Details Defaulting based on options New Document Attributes for all Packages © Ramco Systems. 16
17
© Ramco Systems. 17
18
Aircraft Maintenance Execution
Facility to automatically include Overdue Tasks Change Request Automatic inclusion of overdue tasks on package creation Business Need Inclusion of any overdue tasks pending for Aircraft, on packaging. Change Details New Document Attributes for Packages © Ramco Systems. 18
19
Aircraft Maintenance Execution
Facility to automatically include Due Tasks Change Request Automatic inclusion of tasks which are planned / due for the day on package creation Business Need Inclusion of tasks which are planned / due for the day for Aircraft, on packaging. Change Details New Document Attributes for Packages Inclusion based on Planned Start Date / Schedule date © Ramco Systems. 19
20
Aircraft Maintenance Execution
Facility to automatically include incomplete Tasks Change Request Automatic inclusion of tasks which are marked as Incomplete, on package creation Business Need Mechanic needs to have the visibility of tasks which were taken up for execution and partially accomplished. Change Details New Document Attributes for Packages Task which are partially signed off can be set as ‘Incomplete’ On creation of Package, incomplete tasks gets automatically added to package. Subtasks which are pending for signoff will be available for signoff. © Ramco Systems. 20
21
Auto inclusion options
© Ramco Systems. 21
22
Aircraft Maintenance Execution
Facility to view due tasks Change Request Due task has to be displayed in A/C Maintenance Execution in the left pane Business Need Mechanic can pick due tasks for execution Change Details New Tree in Open Items section Due Tasks horizon based on option © Ramco Systems. 22
23
New Icon © Ramco Systems. 23
24
Aircraft Maintenance Execution
Tree Display Format A/C Reg # ATA :: Task # :: Task Desc :: Trig. Param :: Rem Value Selection of tasks from due list tree enabled Tasks can be assigned to package using ‘Save’ button in the Execution Details Section © Ramco Systems. 24
25
Aircraft Maintenance Execution
Facility to plan for Opportunity Maintenance Change Request Additional search criteria in Perform Opportunity Maintenance Screen Business Need Mechanic can pick due tasks for execution Change Details Search Criteria in Perform Opportunity Maintenance revamped © Ramco Systems. 25
26
26 1) Block Items 2) Non-Block Items 3) Schedule Items
4) Component Removal 5) Discrepancies 6) Eng. Docs 7) Planning Drop-Outs 8) Exe. Drop Outs 9) Short Term Esc. 10) <BLANK> 1)Task Desc. 2)Trig. Param 3)Zone # 4)Position Code 5)Serial # 6)MCR# 7)ATA# 8)Elapsed Time (Hrs.) <= 9)Deferral Type, 10) <BLANK> 1)Task Type 2)Task Category 3)Exe Phase 4)Eng Doc Type 5)Work Center # 6)<BLANK> © Ramco Systems. 26
27
Aircraft Maintenance Execution
Facility to create Auto return Change Request Facility to create automatic return document on completion of package Business Need Parts which are pending for return should be routed to warehouse automatically on completion of work. Change Details New Document Attributes for Package Return document gets generated in Draft status on completion of Package Auto creation of return document based on option configurable at Package Type level. © Ramco Systems. 27
28
Aircraft Maintenance Execution
Facility to complete multiple tasks Change Request Business Need Update task completion after a check for all constituent task. Change Details Tasks which does not have any sign-off requirements are also retrieved for compliance updated in Bulk Signoff interface. © Ramco Systems. 28
29
Shop Maintenance © Ramco Systems. 29
30
Route Unserviceable Facility to route parts from multiple warehouses
Change Request Facility to route parts from multiple warehouses at the same time Business Need Repair Clerk should have visibility of unserviceable parts lying across multiple warehouses and flexibility to route them to different warehouses Change Details Search option ‘All’ has been provided in ‘Unserviceable Routing WH’ combo for retrieving unserviceable part details across unserviceable warehouses. © Ramco Systems. 30
31
Route Unserviceable New value “All” has been added
New columns “Unserviceable Routing WH” and “From Zone” have been added © Ramco Systems. 31
32
Sales Management © Ramco Systems. 32
33
Customer Order Facility to include planning related tasks
Change Request Facility to include planning related tasks into Customer Order created for Aircrafts without any Maintenance Program Business Need Business Development executives should have the visibility of standard check task details even for aircrafts serviced on request Change Details On addition of tasks, all planning related tasks will get added to Customer Order based on a) If Program exists, Block - Base definition identified in the Maintenance Program. b) If Program does not exists, Block Schedule relationship defined in the Task Master. © Ramco Systems. 33
34
Thank You. © Ramco Systems.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.