Download presentation
Presentation is loading. Please wait.
Published byFrancisco Blázquez Nieto Modified over 6 years ago
1
Australian Water Recycling Centre of Excellence NatVal Update
2
National Validation Framework for Water Recycling (NatVal)
: Overview of NatVal Stage 1 Current status of NatVal Stage 2 Next steps
3
Research Goals
4
Streamlining validation
Objectives of safety, consistency and cost effectiveness Development of a national validation framework to support consistent assessment of technologies Development of validation protocols and monitoring for existing and novel technologies and processes
5
National Recycled Water Regulators Forum
National Support “NRWRF recognises the need for a national validation framework for water recycling to protect public health and the environment. We .....(are) committed to working with WQRA and AWRCoE to further develop a nationally acceptable validation framework” National Recycled Water Regulators Forum “WSAA ...support the conceptual draft model of the National Validation framework (and) the further development of this framework with a view to implementation.”
6
The Commonwealth and States have also cooperated to develop national guidance documents for water.
These documents cover environmental water quality, drinking water quality and recycled water in Australia, and have been recognised and adapted by other countries
7
Outputs of NatVal Stage 1
Development of a conceptual framework (Roadmap)
9
Outputs of NatVal Stage 1
Development of a conceptual framework (Roadmap) Identification of priority research gaps (Street Maps) Benefit Cost Analysis and Business Case completed
10
Outputs of NatVal Stage 1
Development of a conceptual framework (Roadmap) Identification of priority research gaps (Street Maps) Benefit Cost Analysis and Business Case completed Presentation of NatVal Framework to Water Quality Policy Sub-committee of Water TOG Submission of detailed research plans for 6 priority project areas in NatVal 2.2
11
AWRCE is the Framework Administrator Protocol Development Group
Framework establishment Phase one Phase two AWRCE is the Framework Administrator ?? NatVal 2.2 NatVal 2.1 Protocol Development Group Research Program Certification Body Database Manager
12
Protocol Development Group
Chaired by AWRCE in the interim Composition 2 reps from Industry (GHD and Toowoomba Regional Council/Water Directorate) 2 reps from Health Regulators (SA and VIC/TAS) 1 WSAA rep Observers (IPART, SEWPAC) Met three times in the last 6 months Objectives – Establishing guidelines for validation protocols and reviewing/”approving” specific validation protocols Early focus on ozone, UV and Chlorine disinfection
13
NatVal 2.2 Research Program
Administered by WaterRA Five subprojects Subproject 1 - Membrane Bioreactors Subproject 2 - Reverse Osmosis membranes Subproject 3 - Activated sludge treatment Subproject 4 - Multiple barriers (integrated systems) Subproject 5 - Pathogen testing methods
14
NatVal 2.2 Research Program
15
NatVal 2.2 Research Program
16
NatVal 2.2 Research Program
17
NatVal 2.2 Research Program Team Leaders
Simon Toze Wolfgang Gernjak Stuart Khan Pierre Le-Clech Paul Monis
18
Protocol Development Group
Links NatVal 2.1 & NatVal 2.2 Protocol Development Group 18
19
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.