Presenter: Chris Lambrecht

Similar presentations


Presentation on theme: "Presenter: Chris Lambrecht"— Presentation transcript:

1 Presenter: Chris Lambrecht

2 This Week’s Highlights
All Parts Ordered and Received Transciever Assembled TX and RX Working Draft of First Paper Completed

3 Baseline Test Setups RX Test Setup TX Test Setup Loop-back Test Setup
Loop-back Close-up

4 Baseline Test Results for RX
D21.5 K28.5 PRBS7 K28.7

5 Baseline Test Results for TX
D21.5 K28.5 PRBS7 K28.7

6 Loop-back Test Succesful
Loop-back Test Using PRBS7

7 Updated GANTT Chart

8 Plans for the Coming Week
Finish Testing and Analysis of Run 1 Finalize First Paper Begin Plans for Run 2