Presentation is loading. Please wait.

Presentation is loading. Please wait.

Launch of Phase 2 September 6, 2017 DoD AMMO Update Jim McCabe

Similar presentations


Presentation on theme: "Launch of Phase 2 September 6, 2017 DoD AMMO Update Jim McCabe"— Presentation transcript:

1 America Makes & ANSI Additive Manufacturing Standardization Collaborative (AMSC)
Launch of Phase 2 September 6, 2017 DoD AMMO Update Jim McCabe Senior Director, Standards Facilitation American National Standards Institute

2 AMSC DoD AMMO Update – slide 2
America Makes & ANSI Additive Manufacturing Standardization Collaborative (AMSC) Launched in March 2016 National Institute of Standards and Technology (NIST), U.S. Department of Defense (DoD), Federal Aviation Administration (FAA), several SDOs were instrumental in the formation of the AMSC Before AMSC there was no process for identifying priorities and interdependencies in the development of standards and specifications for additive manufacturing A number of SDOs are engaged in standards-setting for various aspects of AM, prompting the need for coordination to maintain a consistent, harmonized, and non-contradictory set of AM standards and specifications AMSC DoD AMMO Update – slide 2

3 AMSC Purpose and Objectives
To coordinate and accelerate the development of industry-wide additive manufacturing standards and specifications, consistent with stakeholder needs, and thereby facilitate the growth of the additive manufacturing (AM) industry AMSC’s charter does not include developing standards or specifications; rather, the hope is to help drive coordinated standards development activity Participation open to additive manufacturing stakeholders that have operations in the U.S. Membership in America Makes and ANSI not a prerequisite Draws heavily from aerospace, defense, and medical industries AMSC DoD AMMO Update – slide 3

4 AMSC DoD AMMO Update – slide 4
AMSC Deliverables AMSC Standardization Roadmap for Additive Manufacturing, Version 1.0 (February 2017) Identifies existing standards and specifications, as well as those in development, assesses gaps, and makes recommendations for priority areas where there is a perceived need for additional standardization AMSC Standards Landscape A list of standards that are directly or peripherally related to the issues described in the roadmap Both available as free downloads on AMSC DoD AMMO Update – slide 4

5 AMSC Roadmap Organization “life cycle assessment of an AM part”
Design Process and Materials Precursor Materials Process Control Post-processing Finished Material Properties Qualification & Certification Nondestructive Evaluation Maintenance AMSC DoD AMMO Update – slide 5

6 Activity Since Roadmap’s Publication
Meetings with SDOs to discuss actions on roadmap gaps and recommendations March 29, May 9, July 26, 2017 Promote the roadmap at industry events April 5, 2017 Manufacturing USA Spring Network Meeting April 12, 2017 Space Tech Expo Webinar April 26, 2017 ANSI Company Member Forum May 9, 2017 RAPID + TCT Conference Standardization Forum & Session June 13, DP Innovation Summit (MD&M East) August 30, 2017 ASTM Smart Manufacturing Advisory Committee August 30, 2017 FAA USAF Workshop Q&C of AM Parts September 6, 2017 DoD AMMO September 12, 2017 CAMX Conference AMSC DoD AMMO Update – slide 6

7 AMSC DoD AMMO Update – slide 7
AMSC Phase 2 Phase 2 kick-off meeting Sep 7, 2017 in Philadelphia Download agenda/participate in person or remotely Proposed breakout discussion by industry sector (aerospace/defense, medical, automotive/heavy equipment, energy, industrial & commercial machinery) Expand discussion of other materials (e.g., polymers) Identify potentially overlooked gaps Provide an update on gaps already identified Target date for publication of roadmap version 2.0 end of June 2018 AMSC DoD AMMO Update – slide 7

8 Questions to Be Discussed at 9/7 Meeting
Questions in re: the Roadmap What are the Top Roadmap Gaps for Your Sector? What Issues are Not Covered in the Roadmap? Any Suggested Changes to Roadmap’s Organization? Any Suggested Changes to AMSC Working Group (WG) Structure / Process for Updating the Document? Questions in re: AM Standardization What areas of AM Standardization are Not Being Addressed? What Overlap or Duplication Exists in AM Standardization? What Obstacles Prevent You from Participating in AM Standardization? You can participate in more than one WG AMSC DoD AMMO Update – slide 8


Download ppt "Launch of Phase 2 September 6, 2017 DoD AMMO Update Jim McCabe"

Similar presentations


Ads by Google