Download presentation
Presentation is loading. Please wait.
Published byDaisy Bridges Modified over 6 years ago
1
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
September 2009 doc.: IEEE /0715r8 September 2009 P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot Authors: Name Affiliation Address Phone Stephen McCann Research in Motion 200 Bath Road, Slough, Berks, SL1 3XE, UK Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) Slide 1 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
2
September 2009 doc.: IEEE /0715r8 September 2009 Introduction This document contains an updated report to the IEEE 802 Executive Committee completing conditional approval to send the IEEE P802.11u Draft to Sponsor Ballot. Revision 5 of this document ( r5) was approved during the closing plenary session of the working group on 17 July 2009. Passed in the Task Group yes 14, no 1, abstain 0 Passed in the Working Group yes , no , abstain Slide 2 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
3
September 2009 status after LB156
doc.: IEEE /0715r8 September 2009 September 2009 September 2009 status after LB156 Recirculation ballot LB156 was completed on 18 August 2009 according to the schedule presented on slide #12 The approval percentage from LB156 is 93%. Slide 3 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
4
LB156 required comments resolution
September 2009 doc.: IEEE /0715r8 September 2009 September 2009 LB156 required comments resolution There was 1 new valid DISAPPROVE vote with 1 required comment (CID 8001), but the voter then changed his required comment to not required on 22nd September 2009 (slide #5). There were 4 new required comments (CIDs 8015, 8016, 8013, 8014) from 1 existing DISAPPROVE voter, but the voter then changed these to not required on 22nd September 2009 (slide #6). Slide 4 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
5
September 2009 September 2009 September 2009
doc.: IEEE /0715r8 September 2009 September 2009 -----Original Message----- From: Liwen CHU Sent: 22 September :14 To: Stephen McCann Subject: RE: LB156 - IEEE u Draft 8.0 Comments Hi Stephen, Yes, I can change my comment to "T". Best Regards Liwen -----Original Message----- From: Stephen McCann Sent: Monday, September 21, :47 PM To: Subject: LB156 - IEEE u Draft 8.0 Comments Liwen, TGu is currently addressing comments from LB156 and notes that you have 1 technical required "TR" comment. TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comment to "T", so that it is no longer a "TR". Thanks Slide 5 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
6
September 2009 September 2009 September 2009
doc.: IEEE /0715r8 September 2009 September 2009 -----Original Message----- From: Sent: 22 September :28 To: Stephen McCann Subject: Re: LB156 - IEEE u Draft 8.0 comments Yes I am okay with this. Alastair Malarky -----Original Message----- "Stephen McCann" 09/21/ :51 PM To Subject LB156 - IEEE u Draft 8.0 comments Alastair, TGu is currently addressing comments from LB156 and notes that you have 3 technical required "TR" comment and 1 editorial required "ER" comment. In total TGu currently has 4 "TR" comments and 1 "ER" comment. To allow TGu to progress to sponsor ballot, would you be willing to change your comments to "T" and "E", so they are no longer "required?" Thanks Slide 6 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
7
802.11 WG Letter Ballot Results – P802.11u
September 2009 doc.: IEEE /0715r8 September 2009 WG Letter Ballot Results – P802.11u Ballot ID Ballot Close Date Title BallotType Pool Return %Rtn Abstain %Abs Approve Disapprove %Approve 132 12 July 2008 Technical Letter Ballot for IEEE u_D3.0 Technical 213 182 85.5 35 19.2 113 34 76.9 137 08 October 2008 Recirculation Letter Ballot for IEEE u_D4.0 Recirculation 189 88.7 37 19.6 118 77.6 142 20 February 2009 Recirculation Letter Ballot for IEEE u_D5.0 191 89.7 39 20.4 125 27 82.2 148 24 April 2009 Recirculation Letter Ballot for IEEE u_D6.0 192 90.1 18.2 15 90.4 152 19 June 2009 Recirculation Letter Ballot for IEEE u_D7.0 194 91.0 33 17.0 19 88.2 156 18 Aug 2009 Recirculation Letter Ballot for IEEE u_D8.0 18.0 11 93 Slide 7 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
8
802.11 WG Letter Ballot Comments – P802.11u
September 2009 doc.: IEEE /0715r8 September 2009 WG Letter Ballot Comments – P802.11u Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 132 12 July 2008 Technical Letter Ballot for TGu Draft 3.0 Technical 944 (525 T, 419 E) 137 8 Oct 2008 Recirculation Letter Ballot for TGu Draft 4.0 Recirculation 871 (487 T, 384 E) 142 20 Feb 2009 Second Recirculation Ballot for TGu Draft 5.0 241 (35 T, 206 E) 148 24 April 2009 Third Recirculation Ballot for TGu Draft 6.0 229 (125 T, 104 E) 152 19 Jun 2009 Fourth Recirculation Ballot for TGu Draft 7.0 225 (118 T, 107 E) 156 18 Aug 2009 Fifth Recirculation Ballot for TGu Draft 8.0 68 (24 T, 44 E) Slide 8 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
9
Unsatisfied comments by commenter
September 2009 July 2009 doc.: IEEE /0715r6 doc.: IEEE /0715r8 September 2009 Unsatisfied comments by commenter Voter1 LB132 LB137 LB142 LB148 LB152 LB156 Total Gabor Bajko 15 Clint Chaplin 1 20 21 Peter Ecclesine 4 Darwin Engwer 2 Tom Kolze 3 9 Alastair Malarky 8 Henry Ptasinski 17 10 31 Richard Roy 6 Dorothy Stanley Alexander Tolpin George Vlantis Qi Wang 25 13 5 73 121 Slide 9 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell) Page 9 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
10
Unsatisfied Comments – Topics
September 2009 doc.: IEEE /0715r8 September 2009 Unsatisfied Comments – Topics Topic #Comments Interworking 15 Generic Advertisement Service 44 Subscription Provider Interface Emergency Services 11 Editorial 28 Other 10 Total 121 Slide 10 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
11
Unsatisfied comments September 2009
doc.: IEEE /0715r8 September 2009 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. Slide 11 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
12
TGu Timeline Open Close Third recirculation (TGu draft 8.0) 26-Jul-09
September 2009 doc.: IEEE /0715r8 September 2009 TGu Timeline Open Close Third recirculation (TGu draft 8.0) 26-Jul-09 10-Aug-09 Clean recirculation (TGu draft 8.0) 28-Sep-09 13-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 21-Oct-09 20-Nov-09 Second sponsor ballot 31-Jan-10 15-Feb-10 Third sponsor ballot 17-Mar-10 2-Apr-10 Fourth sponsor ballot 1-May-10 16-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Sep-10 Slide 12 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.