Download presentation
Presentation is loading. Please wait.
1
ELCITA UPDATE March 2018
2
FoB across Hosur Road
3
West Avenue 11 (Cyient Road)
RCC Drain & Footpath West Avenue 9 (3M Side) West Avenue 11 (Cyient Road)
4
RCC Drain & Footpath West Avenue 8 (Devon Innovation Side)
West Avenue 8 (Pump House Side)
5
Railing Work West Avenue 9
6
ABR STP - 9 KLD
7
RCC Pedestal Work East Avenue 3
8
West Avenue 9 (Rs Jn to Petrol Bunk)
Modified Street Light Pole Fixing West Avenue 9 (Rs Jn to Petrol Bunk)
9
UPS Installation at SBI road, Y junction and Tech Mahindra road
10
Tenders Infrastructure works
Supply & Fixing Chain-link Fencing at East Phase. Construction of Footpath along West Avenue 5. Construction of RCC Culvert, Electronics City West & East Phase. Communication related Media and communication Management, Smart City Laying of OFC 48F for Ring 2 & 3 Command center S/W platform
11
Commencement Certificate Occupancy Certificate
Town planning Details FY FY FY FY FY , As On Khatha 6 18 12 11 Building License 2 13 24 31 30 Commencement Certificate 1 4 7 17 8 Occupancy Certificate Nil 23
12
SWM Tendering Process Results
QCBS EVALUATION Technical Weightage Technical Score = 70% of the Technical Weightage Financial Amount Financial Score = (L1 Amount/Bidder Amount) * 30 Consolidated Score = Technical Score + Financial Score Position/Ranking WWMNCS 53.25 37.28 351260 2.14 39.41 3 Sweep Smart 47.75 33.43 273823 2.74 36.16 4 Hasirudala 55.00 38.50 25000 30.00 68.50 1 Saahas 74.25 51.98 314252 2.39 54.36 2
13
A – Tree event on Urban Biodiversity at ELCITA on 28th March
To gather again after 6 months to check on individual developments. An event that brings together different vendors who work on Biodiversity – Seeds, plants, organic food/products, garden equipment's -Vertical garden ,composting for companies ELCITA can keep a database/some equipment's maybe of these vendors for references. A trip to Wipro/A tree - Suggestion
14
ELCITA Organic waste treatment plant.
15
Sewage Treatment Plant
Sl. NO. Month Total Raw water Collection in KL Treated water collection in KL Treatment efficiency in percentage 1 January 5815 98.7% 2 February 4595 4465 97.2% 3 March 5612.2 5567 99.2% Sl. No. STP with Quantity Description of Work Status of work 1 CSTP -300 KLD Installation & commissioning of New air blower of Capacity 450 m3 Brought 2 more companies for sewage pick up service Work completed 2 E-SBR -7 KLD Work order released for water quality parameter tests to check the quality of Treated water. 3 SBT – 8 KLD Work completed 4. ABR STP - 9 KLD DEWATS Anaerobic Baffle Reactor STP Civil work Work under progress 5. World water day World water day celebration at ISBR on 22/03/2018 Attended
16
World water day celebration at ISBR on 22/03/2018
17
E-Waste and Compost January 1.5 tons 880 Kgs February 5 tons 400 Kgs
Month E-waste collected Compost sold January 1.5 tons 880 Kgs February 5 tons 400 Kgs March 1 tons 2315 Kgs Shredding of leaves Pouring water to compost beds
18
Security and Traffic related
19
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.