Download presentation
Presentation is loading. Please wait.
Published byClinton Ross Modified over 6 years ago
1
The OC Plan and Integrated Regional Water Management in Orange County
Amanda Carr Deputy Director, OC Environmental Resources Orange County Water District Water Issues Committee – August 8, 2018
2
The OC Plan Current Status Adoptions:
Orange County Water District – April 18 Orange County Sanitation District – June 27 County of Orange – September 11 (planned) OCWD/OCSD/County Letter to OWOW Steering Committee – July 13
3
Requests Made to OWOW Steering Committee
Incorporate The OC Plan as a separate chapter within the OWOW Plan Allow for Orange County projects to be ranked and prioritized for IRWM funding through The OC Plan process Allocation of 38% of total available grant funds Requested action by September 27 Potential Outcomes
4
Allocation Derivation
Based on San Diego Funding Area Formula, which was based on the Prop. 84 allocation Weighted by land area (27%) and population (73%) County Land Population Weighted Total (Allocation) San Bernardino 36% 28% 30% Riverside 45% 32% Orange 19% 44% 38%
5
Deputy Director, OC Environmental Resources
Questions? Amanda Carr Deputy Director, OC Environmental Resources (714)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.