Presentation is loading. Please wait.

Presentation is loading. Please wait.

Revision Process Summary

Similar presentations


Presentation on theme: "Revision Process Summary"— Presentation transcript:

1 802.11 Revision Process Summary
June 2010 doc.: IEEE /0705r0 June 2010 Revision Process Summary Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 Content Outline Outline of the Previous revision cycle
June 2010 Content Outline Outline of the Previous revision cycle Time Line Amendments Outline of the Current Revision cycle Plan details Ballot reults Bruce Kraemer (Marvell)

3 IEEE 802.11 Amendments Pipeline
June 2010 doc.: IEEE /0705r0 June 2010 IEEE Amendments Pipeline 802.11mb Maintenance r+k+y+n+w 802.11z TDLS MAC e QoS 802.11s Mesh 802.11u WIEN 802.11r Fast Roam h DFS & TPC 802.11k RRM 802.11aa Video Transport 802.11V Network Management i Security 802.11y Contention Based Protocol f Inter AP Smart Grid 802.11ae QoS Mgmt Frm 802.11p WAVE FIA 802.11af TVWS a 54 Mbps 5GHz S1G 802.11n High Throughput (>100 Mbps) g 54 Mbps 2.4GHz 802.11ac VHT 5GHz j 4.9 GHz 802.11W Management Frame Security 802.11ad VHT 60GHz 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Discussion Topics Study groups TG without draft WG Letter Ballot Sponsor Ballot Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

4 IEEE 802.11 MA Revision Plan June 2010 e+h+i+j+f+a+g June 2010
doc.: IEEE /0705r0 June 2010 IEEE MA Revision Plan 802.11ma Maintenance e+h+i+j+f+a+g MAC 802.11e QoS d domains 802.11h DFS & TPC corrigenda 802.11i Security 802.11f Inter AP b QoS 802.11a 5 GHz 802.11g 54 Mbps 2.4 GHz (’97) 2 Mbps DS+IR+FH 802.11j 4.9 GHz Published Amendment Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

5 IEEE 802.11 MB Revision Plan June 2010 r+k+y+n+w June 2010
doc.: IEEE /0705r0 June 2010 IEEE MB Revision Plan 802.11mb Maintenance r+k+y+n+w e QoS 802.11r Fast Roam h DFS & TPC 802.11k RRM i Security 802.11y Contention Based Protocol f Inter AP 802.11p WAVE a 54 Mbps 5GHz 802.11n High Throughput (>100 Mbps) g 54 Mbps 2.4GHz j 4.9 GHz 802.11W Management Frame Security 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Published Standard PHY Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

6 Current TGmb Plan of Record
June 2010 May 2010 doc.: IEEE /0503r4 doc.: IEEE /0705r0 May 2010 June 2010 Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) September 2010 – Sponsor Ballot start. December 2010 – Sponsor Recirc. start March 2011 – WG/EC Final Approval June 2011 – RevCom/SASB Approval Slide 6 Bruce Kraemer (Marvell) Michael Montemurro, Research in Motion Page 6 Bruce Kraemer (Marvell)

7 June 2010 MB Details - 1 Bruce Kraemer (Marvell)

8 June 2010 MB Details - 2 Bruce Kraemer (Marvell)

9 June 2010 Revision Process KEY PAR – Nescom approval B0 – Initial WG ballot BF – Final WG ballot S0 – Initial Sponsor ballot SF – Final Sponsor ballot - Publication date History Forecast (528p) 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 PAR B0 BF S0 SF MA (1232p) PAR B0 BF S0 SF MB (2250p est) PAR MC Bruce Kraemer (Marvell)

10 June 2010 Recent Ballots Bruce Kraemer (Marvell)

11 June 2010 Revision Project - MB Bruce Kraemer (Marvell)


Download ppt "Revision Process Summary"

Similar presentations


Ads by Google