Presentation is loading. Please wait.

Presentation is loading. Please wait.

Innovative and shareable products and tools WP 2

Similar presentations


Presentation on theme: "Innovative and shareable products and tools WP 2"— Presentation transcript:

1 Innovative and shareable products and tools WP 2
Dissemination Working Group Agenda Point 4 14/11/2017 ESTAT.B4 - Chris Laevaert

2 Flagship product "The life of women and men in the EU"

3 Overall Planning November 2016 Finalization Table of Content
(Steering Group 16-Nov) Start development February 2017 1st iteration (PT,PL,FI,EL) April 2017 2nd iteration May-June 2017 EN text version ready May-Sep 2017 Translations October 2017 Go-live

4 Translations Language Translation done by BG CZ DE DE,AT EE EL EN ES
BG CZ DE DE,AT EE EL EN ES FI FR FR,CH HR HU IT LT LV NL BE NO PL PT RO SI SK DK IE SE

5 Some figures (1) - 14 dynamic visualisations - 6 static infographics
- 24 languages - 30 countries - 36 country/language bundles - 28 bundles published on NSI websites

6 Some figures (2) - 10 technical versions (4 shared outside)
- 5 developers - 1 common press release - 20 language versions trailer video

7 Some figures (3) - 10 sleepless nights - Thousands of happy users

8 First assessment High impact on social media and mainstream media
Embedding of visualisation tools LV, EE active discussions on main media and radio portals Impact relatively higher in smaller countries due to language coverage

9 Examples - Video of Le Figaro (FR) - Corriere della sera (IT)
- Corriere della sera (IT) - Tagesschau (DE) - Heute (AT) - Kathimerini (EL) - 3 interviews for TV, radio (BG)

10 Eurostat monitoring - No exact consultation figures yet
- At least page views in October for EN version - About 50% more consultations than similar Energy publication during first week

11 # Mentions - Hourly volume

12 Topics – all languages (en, de, es, fr, it, pt, se)

13 Topics - English

14 Proportion of all Eurostat mentions

15 Women & Men Energy

16 To be repeated ? NSIs Eurostat

17 To be repeated? - overall "production process" was well accepted
- longer "validation" period necessary - heavy workload for Eurostat - cost/benefit to be analysed - update 2018 ?

18


Download ppt "Innovative and shareable products and tools WP 2"

Similar presentations


Ads by Google