Download presentation
Presentation is loading. Please wait.
Published byEsteban Córdoba Villanueva Modified over 6 years ago
1
FACILITIES & INFRASTRUCTURE DEPARTMENT
15 JUNE – 15 JULY 2012
2
ONLINE REPAIR AIRCOND (DONE)
3
ONLINE REPAIR AIRCOND (NOT DONE)
4
ONLINE REPAIR LAMPU (DONE)
5
ONLINE REPAIR LAMPU (NOT DONE)
6
ONLINE REPAIR PIPING/PLUMBING (DONE)
7
ONLINE REPAIR SILING/DINDING/BUMBUNG (NOT DONE)
8
SOFA / KURSI (DONE)
9
ONLINE REPAIR SOFA/KERUSI (NOT DONE)
10
ONLINE REPAIR TANDAS (DONE)
11
ONLINE REPAIR TANDAS (NOT DONE)
12
ROLLER SHUTTER (NOT DONE)
13
MESIN FAX (DONE)
14
MESIN FAX (NOT DONE)
15
FACILITIES & INFRASTRUCTURE PLANNING PROJEK
SOFA REPLACEMENT 1.PP SENAI 2.PP MASAI 3.PP GELANG PATAH
16
OPS SUCI PP SENAI -SOFA REPLACEMENT -WALL PAINTING (BILIK X-RAY)
-LIGHTING (DISPENSARI) -CEALING REPLACEMENT -SCRABING
17
OPS SUCI PP GELANG PATAH -SOFA WASHING -SCRABING
-LIGHTING (DISPENSARI) -CEALING REPLACEMENT
18
PP KOTA TINGGI LAB -PLUMBING -INSTALL SINKY -DOOR INSTALL
-PARTITION INSTALL -MOVEMENT EQUIPMENT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.