Presentation is loading. Please wait.

Presentation is loading. Please wait.

Vayunandan Kumar Konakalla

Similar presentations


Presentation on theme: "Vayunandan Kumar Konakalla"— Presentation transcript:

1 Vayunandan Kumar Konakalla
GMR – Business Workflow System (BWS) Presented by: Sulakshman Madala Vayunandan Kumar Konakalla Ganesh Cheedella

2 Project Sponsor GMR Group, Information Technologies Dept, 50 Raffles Place, #40-02/03, Singapore Land Tower, Singapore T: (65) F: (65)

3 SYSTEM REQUIREMENTS Contd.. For Managers:
System should allow manager to creating work space selecting employees assigning work flows specifying deadlines For Employees: System should allow Employee to Report the work to their reporting authority after completion of work Upload documents Contd..

4 SYSTEM REQUIREMENTS For Business Development: System should allow
Generate Project Summary Reports. Generate Client based Reports Generate Invoice after completion of the each phase of work General Requirements: The proposed system should be having user friendly Interface The system should be accessed only through the secured internal network

5 CONTEXT DIAGRAM

6 LEVEL 0 DIAGRAM

7 LEVEL 1 DIAGRAM

8 LEVEL 1 DIAGRAM

9 Any Questions / Suggestions/ Comments?

10


Download ppt "Vayunandan Kumar Konakalla"

Similar presentations


Ads by Google