Download presentation
Presentation is loading. Please wait.
1
Seattle Public Library
Group 7 Holly Siegrist, Angela Staiger, Cody Gray, Jade Mahar
2
Building Info 362,987-square-foot opened May 23, 2004.
steel-and-glass structure. parking for about 143 vehicles. Its $169.2 million
3
Raised Lettering and Braille
4
Ramp 46” wide, only 36” required
5
Telecommunication Display Device (TDD) Available For People with Hearing and Speech Disabilities
6
Computers “Reserved for Wheelchair Users Only”
Low Desk, No Chair
8
Work Station within LEAP Disability Services Center
9
4th Avenue Entrance with Clearly-marked Access
10
Unlevel Surface (Cracks and Holes) at Threshold
11
Raised Lettering as Part of Floor Design
12
Desks Inaccessible to People with Wheelchairs
or People of Short Stature
13
Chairs 3ft Desks over 3.5ft
14
Wheelchair-Accessible Stall has Handle Not Operable with Closed Fist
15
Sink 2” Too Low Mirror 3” Too High
16
Suggestions for Improvement
For front entrance, resurface cement threshold For bathroom stall, replace handle Bathroom sink and mirror need rearranging Take universal design into consideration for bumpy floor and bathroom arrangement There should be disabled-accessible computers on every floor, not just on the 3rd floor
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.