Download presentation
Presentation is loading. Please wait.
1
Overview of Exercise 4
2
San Marcos Basin
3
Vertices on a line with Measures
100% 0% 0% 51%
4
Vertices on a line with Measures
100% 0% 51%
5
Vertices on a line with Measures
100% 0%
6
Reach Code
7
Linear Referencing
8
River Address of Outlet Point
9
Geodatabase Schema in XML
10
Create Empty Geodatabase and Import the Schema into it
11
Load Data into the feature classes NHDFlowline loaded to HydroEdge
12
Assign HydroID’s to all features
13
Assign Relational Attributes for Monitoring Points
HydroID of HydroJunction is JunctionID of MonitoringPoint
14
Assign Relational Attributes for Watersheds
HydroID of HydroJunction is JunctionID of Watershed
15
Arc Hydro Geodatabase Classes
16
Build the HydroNetwork
17
HydroNetwork
18
Network with Flow Direction Set
19
Tracing tasks Graphical trace upstream Selection trace downstream
20
Tracking Analyst
21
Tracking Animation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.