Presentation is loading. Please wait.

Presentation is loading. Please wait.

Magdy Ebeid VP of Operation

Similar presentations


Presentation on theme: "Magdy Ebeid VP of Operation"— Presentation transcript:

1 Magdy Ebeid VP of Operation
IBM POWER9 Scale-out Magdy Ebeid VP of Operation

2 Agenda Topics IBM End of Maintenance Service Announcement
IBM POWER9 Announcement

3 IBM Servers to be withdrawn

4

5 IBM POWER9 S924 First Look IBM POWER9

6 POWER9 Scale-out Servers
Highest performance and security The most reliable Built in PowerVM and PowerVC Industry leader in the 2 socket market

7 POWER9 Offering Roadmap
2018 More performance and scale via POWER9 processors 2-4X Memory capacity for in-memory DB Reduce latency and improve throughput with enhanced I/O support PCIe Gen4 Integrated NVMe Flash (bootable) High-bandwidth (25Gb/s) links for GPU/OpenCAPI acceleration 2-socket LC & Entry SOR 4-socket Midrange 4- to16-socket Modular High-end Large-scale multi-socket SMP Buffered memory attach Robust 2-socket SMP Direct memory attach 2017 2-socket LC HPC / HPDA & HSDC

8 POWER9 Processor features that effect the Servers

9

10 Scale out Portfolio Transition

11 Comparison POWER8 vs POWER9

12 POWER9 S914

13 POWER9 S924

14 POWER9 S922

15 PowerVM offer PowerVM Enterprise is no cost with POWER9 Scale-Out
Wow, that is NEW !! There is SWMA to pay. Live Partition Mobility to quick move from P7 & P8 servers 1. Use a temporary IBM PowerVM LPM license for P7 & P8 Request a MES upgrade for a temporary LPM VET code Up to 60 days 2. Don’t need PowerVM or to pay SWMA = IBM has a process for that! 3. Can’t have LPM due to vendor SW licence (Oracle) MES upgrade for a no cost LPM permanent LPM disable


Download ppt "Magdy Ebeid VP of Operation"

Similar presentations


Ads by Google