Download presentation
Presentation is loading. Please wait.
1
G-10 Committee Status Report - 2008
Name: G-10 Aerospace Behavioral Engineering Technology (ABET) Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 60 # Participants on Roster: 285 # Documents Maintained: 26 # WIPs: 19 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 34.78% Average time from WIP to publication: 1561 % Voting members attending meetings: 57% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.
2
S-18 Committee Status Report - 2008
Name: S-18 Aircraft and System Development and Safety Assessment Committee Length of Current Chair’s Term of Office: 16 years # Mtgs/Year: 4 # Members: 44 # Participants on Roster: 104 # Documents Maintained: 4 # WIPs: 2 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 1621 % Voting members attending meetings: 65% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed General Electric (propulsion side) More Part 23 OEMs
3
G-13 Committee Status Report - 2008
Name: G-13 Human Modeling Technology Standards Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 0 # Members: 16 # Participants on Roster: 77 # Documents Maintained: 1 # WIPs: 2 # Documents Past 5-Year Review Date: 1 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Need to determine if committee will continue to exist; recent interest in reactivating the committee from the user side of human modeling
4
G-14 Committee Status Report - 2008
Name: G-14 Americas Aerospace Quality Group Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 19 # Participants on Roster: 377 # Documents Maintained: 38 # WIPs: 9 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 110 days % Voting members attending meetings: 80% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed DoD, FAA, NASA, suppliers, defense companies, airlines News/Changes/Issues Addressing issues concerning voting procedures
5
G-16 Committee Status Report - 2008
Name: G-16 Aviation Fuel Operations Committee Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 39 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 53% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.
6
G-17 Committee Status Report - 2008
Name: G-17 Human Factors in Aerospace Maintenance Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 20 # Participants on Roster: 43 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 44% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.
7
G-18 Committee Status Report - 2008
Name: G-18 Radio Frequency Identification (RFID) Aerospace Applications Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 9 # Participants on Roster: 45 # Documents Maintained: 2 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 67% Average time from WIP to publication: 216 % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Recent request made by FAA to G-18 to work on a Minimum Performance Standard of Active RFIDs.
8
G-19 Committee Status Report - 2008
Name: G-19 Counterfeit Electronic Parts Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: Meeting via teleconference # Members: 26 # Participants on Roster: 53 # Documents Maintained: 0 # WIPs: 1 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Newly created in Nov Good participation. May start work on non-electronic counterfeit parts.
9
E-1 Committee Status Report - 2008
Name: E-1 Environmental Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: Meeting via teleconference # Members: 7 # Participants on Roster: 20 # Documents Maintained: 2 # WIPs: 0 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 100% Average time from WIP to publication: 61 days % Voting members attending meetings: N/A # Projects meeting estimated pub date: 100% This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Newly created committee. Good participation.
10
AE-2 Committee Status Report - 2008
Name: AE-2 Lightning Committee Length of Current Chair’s Term of Office: 11 years # Mtgs/Year: 3 # Members: 37 # Participants on Roster: 106 # Documents Maintained: 5 # WIPs: 2 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 61.11% Average time from WIP to publication: 98 days % Voting members attending meetings: 74% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Pratt & Whitney, GE, Eclipse, HondaJet, Boeing, Learjet, Gulfstream, Cirrus
11
AE-4 Committee Status Report - 2008
Name: AE-4 Electromagnetic Compatibility Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 44 # Participants on Roster: 121 # Documents Maintained: 25 # WIPs: 5 # Documents Past 5-Year Review Date: 8 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 775 days % Voting members attending meetings: 30% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Looking for more active participation and project development News/Changes/Issues New project started working jointly with EUROCAE; AE-4HIRF User Guide Working Group
12
AE-7 Committee Status Report - 2008
Name: AE-7 Aerospace Electrical Power & Equipment Committee Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 258 # Documents Maintained: 20 # WIPs: 5 # Documents Past 5-Year Review Date: 14 Metrics Average % member response to ballots: 77.78% Average time from WIP to publication: 646 days % Voting members attending meetings: 22% # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed GE (Smiths), Hamilton Sundstrand, Honeywell, Embraer, Bombardier, Airlines
13
AE-8 Committee Status Report - 2008
Name: AE-8 Aerospace Electrical/Electronic Distribution Systems Committee Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 196 # Participants on Roster: 444 # Documents Maintained: 774 # WIPs: 99 # Documents Past 5-Year Review Date: 123 Metrics Average % member response to ballots: 60.22% Average time from WIP to publication: 441 days % Voting members attending meetings: 57% # Projects meeting estimated pub date: 91% This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Labinal, Boeing Commercial, Northrup, Raytheon (Space), Boeing (Space), EADS (North America), L-3, BAE Aerospace, Woven Electronics, LaBarge, Chas, Gillman Corp., Lourdes, Honeywell Would like QPLed companies to participate
14
A-4 Committee Status Report - 2008
Name: A-4 Aircraft Instruments Length of Current Chair’s Term of Office: 28 years # Mtgs/Year: 2 # Members: 8 # Participants on Roster: 71 # Documents Maintained: 95 # WIPs: 2 # Documents Past 5-Year Review Date: 22 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 48% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Concern with RTCA presence in document production normally requested of SAE by FAA
15
A-5 Committee Status Report - 2008
Name: A-5 Aerospace Landing Gear Systems Length of Current Chair’s Term of Office: 8 years # Mtgs/Year: 2 # Members: 47 # Participants on Roster: 343 # Documents Maintained: 89 # WIPs: 29 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 49% Average time from WIP to publication: 811 days % Voting members attending meetings: 44% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines: Delta; United; US Airways News/Changes/Issues Committee to hold next European meeting in Bristol, England in Fall 2009
16
A-10 Committee Status Report - 2008
Name: A-10 Aircraft Oxygen Equipment Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 42 # Participants on Roster: 131 # Documents Maintained: 59 # WIPs: 28 # Documents Past 5-Year Review Date: 19 Metrics Average % member response to ballots: 64% Average time from WIP to publication: days % Voting members attending meetings: 55% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Fall 2008 Meeting to be held in Wembley, England
17
A-20 Committee Status Report - 2008
Name: A-20 Aircraft Lighting Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 2 # Members: 15 # Participants on Roster: 143 # Documents Maintained: 51 # WIPs: 10 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 44% Average time from WIP to publication: days % Voting members attending meetings: 62% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed FedEx Delta Airlines United Airlines US Airways
18
A-21 Committee Status Report - 2008
Name: A-21 Aircraft Noise Length of Current Chair’s Term of Office: 13 years # Mtgs/Year: 2 # Members: 22 # Participants on Roster: 96 # Documents Maintained: 22 # WIPs: 3 # Documents Past 5-Year Review Date: 13 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 226 % Voting members attending meetings: 60% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Vice Chair position created and filled by Committee Member from UK. Promotes strong international support and presence for continued growth within non-US organizations.
19
AC-9 Committee Status Report - 2008
Name: AC-9 Aircraft Environmental Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 34 # Participants on Roster: 318 # Documents Maintained: 66 # WIPs: 13 # Documents Past 5-Year Review Date: 7 Metrics Average % member response to ballots: 71% Average time from WIP to publication: 1739 days % Voting members attending meetings: 46% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Fall 2008 Meeting to be held in Brazil hosted by Embraer and SAE Brazil will be present and assisting in the coordination efforts.
20
S-7 Committee Status Report - 2008
Name: S-7 Flight Deck & Handling Qualities Standards for Transport Aircraft Length of Current Chair’s Term of Office: <1 year # Mtgs/Year: 2 # Members: 8 # Participants on Roster: 101 # Documents Maintained: 38 # WIPs: 21 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 38% Average time from WIP to publication: N/A % Voting members attending meetings: 50% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Delta; Fed Ex; US Airways; EASA News/Changes/Issues New Chair has been voted in. Voting Member Requirements Under Review Spring Meeting in Vienna had better Participation
21
S-9 Committee Status Report - 2008
Name: S-9 Cabin Safety Provisions Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 79 # Documents Maintained: 40 # WIPs: 19 # Documents Past 5-Year Review Date: 13 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 839 days % Voting members attending meetings: 74% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed EASA United Airlines US Airways
22
SEAT Committee Status Report - 2008
Name: SEAT Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 3 # Members: 19 # Participants on Roster: 225 # Documents Maintained: 8 # WIPs: 7 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 65% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues New task group, SEAT Force Limits for Actuated Systems Working Group has been developed to address Aircraft Seat Design Guidance and Clarifications within the Aircraft Seat Design Industry. Work Continuing.
23
ACBG Committee Status Report - 2008
Name: ACBG Airframe Control Bearings Group Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 7 # Participants on Roster: 112 # Documents Maintained: 110 # WIPs: 57 # Documents Past 5-Year Review Date: 40 Metrics Average % member response to ballots: 59% Average time from WIP to publication: 925 days % Voting members attending meetings: 52% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee meeting in Everett, Washington hosted by Boeing Fall 2008.
24
AGE-2 Committee Status Report - 2008
Name: AGE-2 Air Cargo & Aircraft Ground Equipment and Systems Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 243 # Documents Maintained: 133 # WIPs: 43 # Documents Past 5-Year Review Date: 31 Metrics Average % member response to ballots: 70% Average time from WIP to publication: 622 days % Voting members attending meetings: 59% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines: American; United; Northwest; Japan; Lufthansa; All Nippon; Federal Express; United Parcel Service; US Airways; Air Canada; Swissport; Menzies Aviation; Penauille Servisair News/Changes/Issues 100th Meeting Fall 2008
25
G-12 Committee Status Report - 2008
Name: G-12 Aircraft Ground Deicing Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 1 # Members: 25 # Participants on Roster: 576 # Documents Maintained: 27 # WIPs: 7 # Documents Past 5-Year Review Date: 9 Metrics Average % member response to ballots: 49% Average time from WIP to publication: 546 days % Voting members attending meetings: 67% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Lufthansa; Gulfstream; Dassault News/Changes/Issues G-12 Committee Meetings – Charleston, SC for 2009 then non-US meeting 2010
26
G-15 Committee Status Report - 2008
Name: G-15 Airport Snow & Ice Control Equipment Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 1 # Members: 26 # Participants on Roster: 70 # Documents Maintained: 3 # WIPs: 5 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 31% Average time from WIP to publication: 1016 % Voting members attending meetings: 42% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues ISSUE: Committee would like to see more participation from the airport equipment end-users. Chair to provide contact information to SAE. Assistance requested.
27
AMEC Committee Status Report - 2008
Name: AMEC Aerospace Metals Engineering Committee Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 5 # Members: 34 # Participants on Roster: 147 # Documents Maintained: 3 # WIPs: 8 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: 44% Average time from WIP to publication: N/A % Voting members attending meetings: 36% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues AMEC held their 200th committee meeting in March 2008 in Torrance, CA
28
AMS B Committee Status Report - 2008
Name: AMS B Finishes, Processes & Fluids Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 28 # Participants on Roster: 148 # Documents Maintained: 196 # WIPs: 32 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 53% Average time from WIP to publication: 386 days % Voting members attending meetings: 52% # Projects meeting estimated pub date: 10 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter
29
CACRC Committee Status Report - 2008
Name: CACRC Commercial Aircraft Composite Repair Committee Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 65 # Participants on Roster: 322 # Documents Maintained: 27 # WIPs: 24 # Documents Past 5-Year Review Date: 12 Metrics Average % member response to ballots: 54% Average time from WIP to publication: 369 days % Voting members attending meetings: 27% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airlines News/Changes/Issues In the early stages of working with PAMA on Composites Maint./Repair Certification Standards Development
30
AMS CE Committee Status Report - 2008
Name: AMS CE Elastomers Committee Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 13 # Participants on Roster: 152 # Documents Maintained: 160 # WIPs: 65 # Documents Past 5-Year Review Date: 91 Metrics Average % member response to ballots: 50% Average time from WIP to publication: 524 days % Voting members attending meetings: 50% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Meeting for the first time with the E-25 committee in September 2008
31
AMS D Committee Status Report - 2008
Name: AMS D Nonferrous Alloys Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 105 # Documents Maintained: 460 # WIPs: 54 # Documents Past 5-Year Review Date: 11 Metrics Average % member response to ballots: 60% Average time from WIP to publication: days % Voting members attending meetings: 60% # Projects meeting estimated pub date: 20 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter
32
AMS E Committee Status Report - 2008
Name: AMS E Carbon and Low Alloy Steels Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 93 # Documents Maintained: 257 # WIPs: 12 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 171 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 9 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter
33
AMS F Committee Status Report - 2008
Name: AMS F Corrosion Heat Resistant Steel and Alloys Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 90 # Documents Maintained: 461 # WIPs: 54 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 321 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 20 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter
34
AMS G Committee Status Report - 2008
Name: AMS G Titanium and Refractory Materials Committee Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 24 # Participants on Roster: 98 # Documents Maintained: 140 # WIPs: 23 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 54% Average time from WIP to publication: 177 days % Voting members attending meetings: 58% # Projects meeting estimated pub date: 18 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Northrop Grumman Bell Helicopter Eaton Boeing Helicopter Williams International Sikorsky Helicopter
35
AMS G-8 Committee Status Report – 2008
Name: G-8 Aerospace Organic Coatings Committee Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 30 # Participants on Roster: 290 # Documents Maintained: 32 # WIPs: 22 # Documents Past 5-Year Review Date: 19 Metrics Average % member response to ballots: 47% Average time from WIP to publication: 928 days % Voting members attending meetings: 45% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking for active user members that want to participate in our specification writing and balloting processes. Participation wanted from airlines.
36
AMS G-9 Committee Status Report - 2008
Name: G-9 Aerospace Sealing Committee Length of Current Chair’s Term of Office: 20 years # Mtgs/Year: 2 # Members: 59 # Participants on Roster: 284 # Documents Maintained: 58 # WIPs: 22 # Documents Past 5-Year Review Date: 34 Metrics Average % member response to ballots: 51% Average time from WIP to publication: 280 days % Voting members attending meetings: 57% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Airbus and other European companies 3M DOW General Electric Silicones Doe Corning Silicones Airlines
37
AMS J Committee Status Report - 2008
Name: AMS J Aircraft Maintenance Chemicals and Materials Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 1 # Members: 15 # Participants on Roster: 102 # Documents Maintained: 70 # WIPs: 20 # Documents Past 5-Year Review Date: 21 Metrics Average % member response to ballots: 87% Average time from WIP to publication: 861 days % Voting members attending meetings: 53% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues This committee is in search of a new chairman. They currently have a volunteer filling in the role temporarily. Need to increase overall participation
38
AMS K Committee Status Report - 2008
Name: AMS K Non-Destructive Methods and Processes Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 43 # Participants on Roster: 113 # Documents Maintained: 31 # WIPs: 19 # Documents Past 5-Year Review Date: 17 Metrics Average % member response to ballots: 19% Average time from WIP to publication: 548 days % Voting members attending meetings: 31% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board.
39
AMS M Committee Status Report - 2008
Name: AMS M Aerospace Greases Committee Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 23 # Participants on Roster: 57 # Documents Maintained: 9 # WIPs: 3 # Documents Past 5-Year Review Date: 8 Metrics Average % member response to ballots: 29% Average time from WIP to publication: 66 days % Voting members attending meetings: 41% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Looking to increase membership by contacting any grease companies that are not currently represented.
40
AMS P Committee Status Report - 2008
Name: AMS P Polymeric and Composite Materials Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 2 # Members: 31 # Participants on Roster: 105 # Documents Maintained: 470 # WIPs: 168 # Documents Past 5-Year Review Date: 314 Metrics Average % member response to ballots: 61% Average time from WIP to publication: 773 days % Voting members attending meetings: 60% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking for user members from the Polymeric and Composite Materials world. This group has plenty of supplier members, but needs to increase their user membership.
41
G-11 Committee Status Report - 2008
Name: G-11 Maintainability, Reliability and Probabilistic Methods Length of Current Chair’s Term of Office: 2 years # Mtgs/Year: 2 # Members: 14 # Participants on Roster: 18 # Documents Maintained: 24 # WIPs: 0 # Documents Past 5-Year Review Date: 16 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: 78% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is currently in the rebuilding stage. They are looking for overall committee participation.
42
AS-1 Committee Status Report - 2008
Name: AS-1 Aircraft Systems and Systems Integration Committee Length of Current Chair’s Term of Office: 1 year # Mtgs/Year: 4 # Members: 25 # Participants on Roster: 335 # Documents Maintained: 48 # WIPs: 16 # Documents Past 5-Year Review Date: 10 Metrics Average % member response to ballots: 55% Average time from WIP to publication: 309 days % Voting members attending meetings: 48% # Projects meeting estimated pub date: 2 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics
43
AS-2 Committee Status Report – 2008
Name: AS-2 Embedded Computing Systems Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 3 # Members: 29 # Participants on Roster: 119 # Documents Maintained: 5 # WIPs: 6 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 66% Average time from WIP to publication: 1522 days % Voting members attending meetings: 26% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics
44
AS-3 Committee Status Report - 2008
Name: AS-3 Fiber Optics and Applied Photonics Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 33 # Participants on Roster: 326 # Documents Maintained: 14 # WIPs: 11 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 58% Average time from WIP to publication: 306 days % Voting members attending meetings: 42% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics
45
AS-4 Committee Status Report - 2008
Name: AS-4 Unmanned Systems Length of Current Chair’s Term of Office: 4 years # Mtgs/Year: 2 # Members: 48 # Participants on Roster: 207 # Documents Maintained: 4 # WIPs: 3 # Documents Past 5-Year Review Date: 0 Metrics Average % member response to ballots: 91% Average time from WIP to publication: 780 days % Voting members attending meetings: 35% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Raytheon UTC Boeing Mesa Armed Forces General Atomics
46
A-6 Committee Status Report - 2008
Name: A-6 Aerospace Actuation, Control and Fluid Power Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 43 # Participants on Roster: 927 # Documents Maintained: 139 # WIPs: 78 # Documents Past 5-Year Review Date: 60 Metrics Average % member response to ballots: 57% Average time from WIP to publication:1,417 days % Voting members attending meetings: 82% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Needs participation from the airlines, Military airframe companies and aircraft engine companies Changes/News/Issues
47
AE-5 Committee Status Report - 2008
Name: AE-5 Aerospace Fuel, Oil and Oxidizer Systems Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 41 # Participants on Roster: 339 # Documents Maintained: 50 # WIPs: 27 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 77% Average time from WIP to publication: 1,202 days % Voting members attending meetings: 41% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Major aircraft manufacturers and fuel system suppliers, U.S. Army fuels system branch Changes/News/Issues
48
G-3 Committee Status Report - 2008
Name: G-3 Aerospace Couplings, Fittings, Hose and Tubing Assemblies Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 17 # Participants on Roster: 995 # Documents Maintained: 1,112 # WIPs: 240 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 60% Average time from WIP to publication: 450 days % Voting members attending meetings: 65% # Projects meeting estimated pub date: 24 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership. Changes/News/Issues
49
AE-1 Committee Status Report - 2008
Name: AE-1 Engine Accessory Installations Length of Current Chair’s Term of Office: 5 years # Mtgs/Year: 2 # Members: 6 # Participants on Roster: 21 # Documents Maintained: 42 # WIPs: 6 # Documents Past 5-Year Review Date: 28 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking to merge with the AE-6 Committee. Each committee deals with rather mature technical issues, and new business is slow in developing and does not sustain enough interest.
50
AE-6 Committee Status Report - 2008
Name: AE-6 Starting Systems and Auxiliary Power Length of Current Chair’s Term of Office: 7 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 21 # Documents Maintained: 42 # WIPs: 6 # Documents Past 5-Year Review Date: 21 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed This committee is looking to merge with the AE-1 Committee. Each committee deals with rather mature technical issues, and new business is slow in developing and does not sustain enough interest.
51
E-25 Committee Status Report - 2008
Name: E-25 General Standards for Aerospace and Propulsion Systems Length of Current Chair’s Term of Office: 8 years # Mtgs/Year: 2 # Members: 11 # Participants on Roster: 89 # Documents Maintained: 993 # WIPs: 117 # Documents Past 5-Year Review Date: 10 Metrics Average % member response to ballots: 73% Average time from WIP to publication: 515 days % Voting members attending meetings: 73% # Projects meeting estimated pub date: 1 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs DoD participation Changes/News/Issues E-25 will meet for the first time with the AMS CE Committee – October 2008
52
E-30 Committee Status Report - 2008
Name: E-30, Propulsion Ignition Systems Length of Current Chair’s Term of Office: 10 years # Mtgs/Year: 2 years # Members: 7 # Participants on Roster: 18 # Documents Maintained: 45 # WIPs: 0 # Documents Past 5-Year Review Date: 46 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee is currently inactive.
53
E-31 Committee Status Report - 2008
Name: E-31 Aircraft Exhaust Emissions Measurement Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 1 # Members: 25 # Participants on Roster: 58 # Documents Maintained: 6 # WIPs: 4 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: N/A Average time from WIP to publication: 509 % Voting members attending meetings: 74% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership Changes/News/Issues
54
E-32 Committee Status Report - 2008
Name: E-32 Engine Condition Monitoring Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 2 # Members: 47 # Participants on Roster: 152 # Documents Maintained: 31 # WIPs: 7 # Documents Past 5-Year Review Date: 14 Metrics Average % member response to ballots: 0% Average time from WIP to publication: days % Voting members attending meetings: 54% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs participation from domestic and European carriers Changes/News/Issues
55
E-33 Committee Status Report - 2008
Name: E-33 In-Flight Propulsion Measurement Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 70 # Participants on Roster: 74 # Documents Maintained: 7 # WIPs: 3 # Documents Past 5-Year Review Date:0 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 2370 days % Voting members attending meetings: 33% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed No issues with membership Changes/News/Issues
56
E-34 Committee Status Report - 2008
Name: E-34 Propulsion Lubricants Length of Current Chair’s Term of Office: 2 year # Mtgs/Year: 2 # Members: 66 # Participants on Roster: 132 # Documents Maintained: 9 # WIPs: 2 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 188 days % Voting members attending meetings: 65% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Changes/News/Issues
57
E-35 Committee Status Report - 2008
Name: E-35, Propulsion Economics for Acquisition & Ownership Committee Length of Current Chair’s Term of Office: 21 years # Mtgs/Year: 2 years # Members: 18 # Participants on Roster: 50 # Documents Maintained: 3 # WIPs: 0 # Documents Past 5-Year Review Date: 3 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. News/Changes/Issues Committee is currently inactive
58
E-36 Committee Status Report - 2008
Name: E-36 Electronic Engine Controls Length of Current Chair’s Term of Office: 6 years # Mtgs/Year: 2 # Members: 33 # Participants on Roster: 61 # Documents Maintained: 8 # WIPs: 2 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 301 days % Voting members attending meetings: 56% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Changes/News/Issues
59
EG-1 Committee Status Report - 2008
Name: EG-1 Aerospace Propulsion Systems Support Equipment Length of Current Chair’s Term of Office: 9 years # Mtgs/Year: 2 # Members: 58 # Participants on Roster: 8398 # Documents Maintained: 41 # WIPs: 234 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 936 days % Voting members attending meetings: 0% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed OEM’s Pratt & Whitney FAA Boeing Rolls-Royce
60
S-12 Committee Status Report - 2008
Name: S-12 Helicopter Powerplant Length of Current Chair’s Term of Office: 3 years # Mtgs/Year: 1 # Members: 9 # Participants on Roster: 16 # Documents Maintained: 27 # WIPs: 5 # Documents Past 5-Year Review Date: 26 Metrics Average % member response to ballots: N/A Average time from WIP to publication: N/A % Voting members attending meetings: N/A # Projects meeting estimated pub date: N/A This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed The committee has not met since April 2006. Changes/News/Issues
61
S-15 Committee Status Report - 2008
Name: S-15 Engine Performance Presentation for Electronic Digital Computers Length of Current Chair’s Term of Office: 22 years # Mtgs/Year: 2 # Members: 16 # Participants on Roster: 50 # Documents Maintained: 10 # WIPs: 4 # Documents Past 5-Year Review Date: 4 Metrics Average % member response to ballots: 75% Average time from WIP to publication: 190 days % Voting members attending meetings: 73% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Committee needs participation from Airbus Changes/News/Issues
62
S-16 Committee Status Report - 2008
Name: S-16 Turbine Engine Inlet Flow Distortion Length of Current Chair’s Term of Office: 27 years # Mtgs/Year: 2 # Members: 27 # Participants on Roster: 45 # Documents Maintained: 5 # WIPs: 4 # Documents Past 5-Year Review Date: 2 Metrics Average % member response to ballots: 0% Average time from WIP to publication: 739 % Voting members attending meetings: 92% # Projects meeting estimated pub date: 0 This slide’s only purpose is to review format of metrics presentation. The format was recently presented by NMC Chair, Arne Logan, and approved by the Board. Membership Needed Chairman is pursuing participation from Northrop Grumman Changes/News/Issues
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.