Presentation is loading. Please wait.

Presentation is loading. Please wait.

A Portion of the SCP RF Control System LCLS Related

Similar presentations


Presentation on theme: "A Portion of the SCP RF Control System LCLS Related"— Presentation transcript:

1 A Portion of the SCP RF Control System LCLS Related
Many items have been omitted because I forgot to include them If I redid this talk weekly for 20 years I would get closer to a complete summary of the SLC Control System R. Akre June 27, 2008

2 Sector 0 RF Master Oscillator Master Amplifier Fiducial Generator
Voltages Temperature Frequency Power Cross over switch Master Amplifier Power Levels Fiducial Generator Countdown Chassis Sec 2 to 30 phase shifter MTG Modules (PEP SLC) PDUs FIDOs 360Hz DRTC MDL Interferometer MDL Feedback

3 Timing System MPG Beam Code
PNET, PP YY, and all the other stuff I don’t understand

4 RF System Triggers 1 Reactivate or Deactivate Klystrons on Different Beam Codes Select Rates for Klystrons with Conditional Statements

5 RF System Triggers 2 Beam conditional requirements for triggers

6 240+ Klystrons in Linac Monitors VVS voltage and
VVS control voltages and Status

7 Fast Time Plots many Parameters
Waveforms and Jitter Data Selection Based on Beam Codes

8 Routines for Setup Fortran routines to calculate No-Load Energies and Measure Klystron Timing

9 PIOP Data Critical Parameters of Stations Quickly Available
Values, Expected Valued Tolerances Trip Limits Fault Status Available The summary is shown, many pages of the full piop data is also available

10 Some of the Maintenance Features
Local control of station Control of timing Control of amplitude Eliminates Remote operation of station power level Automatically s Reports weekly Analysis of Reference system Fault analysis Automatically s Reports daily Klystron parameters

11 Saturation Fast Time Plot
Accept saturated value as attenuator set point

12 High power RF Processing Algorithms
Normal and Slow start up modes Auto fault recovery (Vacuum and RE) Off for predetermined number of pulses on fault Shut off after preset number of faults

13 Fault Error Counting Counts faults every day
Can count faults from set time onward or from 8:00am

14 History Buffers History of Jitter Last 24 hours with press of a button

15 History Buffer Correlations
Variety of ways to display data

16 Correlation Plots Set up plot to collect data from SCP variables
Primary and Secondary step variables Set up displays Output to Matlab or Binary files Save/Restore Button files Record functions of variables Powerful tool for diagnosing problems

17 Beam Synchronous Acquisition
Collects buffered sequential synchronous data Up to 330 variables at a time Up to 2048 samples? Export to Matlab Save Button Files Can display in many formats Sequential B vs. A correlation FFTs

18 Diagnostic Panels 1 25 Years of Software Development
Many diagnostic panels Can read and write to low level hardware

19 Diagnostic Panels 2 Routines to measure sensitivity of phase shifters
Routines to enter polynomials for phase shifters into database

20 CW Phase Monitors Monitor of Phase Reference System
Bring up last 24 hour history with the press of a button Routines to calibrate phase shifters

21 This presentation was only a small portion of the features the SLC control system has built in.


Download ppt "A Portion of the SCP RF Control System LCLS Related"

Similar presentations


Ads by Google