MANDATE Responsible for proclaimed national road network
Toll and Non-Toll network Maintain, upgrade, operate, rehabilitate and fund national roads Levy tolls to service toll roads Advise the Minister on road related matters Create public value
3
South African Road Network - 2014
Authority Paved Gravel Total SANRAL (2015) 21,452 Provinces – 9 (2015) 47,300 226,273 273,573 Metros - 8 51,682 14,461 66,143 Municipalities 37,691 219,223 256,914 158,124 459,957 618,081 Un-Proclaimed (Estimate) 131,919 Estimated Total 591,876 750,000 Un-Proclaimed Roads = Public roads not formally gazetted by any Authority
4
Pavement Age Please Note: 75% of Network Older than Original 20 Year Design Life
5
What Is The Price We Pay – Government
Repair Cost = X / km Repair Cost = 6X / km (Ratio 1:6) Good Fair Repair Cost = 18X / km (Ratio 1:18) Poor 3-5 Years Very Poor 5-8 Years This slides indicates the primary reason for why SANRAL is in the process of incorporating roads that is part of the strategic national road network currently under Provincial government control, under its jurisdiction. Due to no or very little preventative maintenance being performed by provincial governments as a result of severe budget and capacity constraints, the strategic road network has entered a phase of accelerated deterioration. As seen the cost impact of delaying maintenance on a road maintenance delayed by 3 years will result in an additional cost of six (6) times the original amount. And should commencement of maintenance be delayed a further 2 years the funding requirement will increase dramatically – eighteen (18) times the original amount. Please Note: Typical Costs for 11.4m Wide Road in Flat Terrain 5
6
What Is The Price We Pay – Road User
Please Note: Costs exclude fuel, travel time, cargo damage, etc. components
7
NATIONAL ROAD NETWORK (km)
Description Non Toll Agency Toll BOT Total Dual Carriageway 610 520 443 1 573 4-Lane Undivided 11 299 240 550 2-Lane Single 18 151 1013 605 19 769 18 772 1 832 1 288 21 892 % of SANRAL Network 86% 8% 6% Total RSA Road Network Estimated to be 750,000 km
8
Total Employees: 305
9
SANRAL’s Cluster Structure
10
NATIONAL ROAD NETWORK GROWTH (km)
11
SANRAL Budget Need vs Allocation
14
Note: The implication of No New Toll Roads and no additional budget (R11.89bn per year additional over 10 years) from National Treasury will be far reaching for the national road network and the road users. If the decision is made that all the required Expansion requirements must be constructed over 10 year period, using the existing non-toll budget, the impact of this approach will be disastrous on the condition of the rest of the non toll road network, since remaining budget available can only cover routine maintenance needs.
15
Note: Allowing planned Expansions to proceed as Toll Roads or increasing allocation to SANRAL by additional R11.89bn per year over 10 years, will have far reaching positive impact for the national road network and the road users. If Expansions can be funded through toll or increased non toll allocation to SANRAL, the length of non-toll network to be maintained using existing non-toll budget, will immediately decrease by 2,000km, resulting in more budget being available to address maintenance and strengthening requirements.
16
Non-Toll Budget (Rand ‘000)
Description Budget 2015/16 Budget 2016/17 Budget 2017/18 Budget 2018/19 Treasury Allocations Adhoc Maintenance Routine Maintenance Periodic Maintenance Special Maintenance Strengthening Improvements New Facilities Land Acquisition 15 000 30 000 Community Development Projects
17
Toll Budget (Rand ‘000) Description Budget 2015/16 Budget 2016/17
Total Income Adhoc Maintenance 16 566 63 227 56 365 37 626 Routine Operations Periodic Maintenance Special Maintenance 68 777 Strengthening Improvements New Facilities Finance Charges
18
National Development Plan (NDP)
By 2030 aims to: Eliminate income poverty Community Development Programme SMME Development Reduce inequality. Develop Human Capital Improve access to national roads Enabling milestones: Increase employment from 13 m in 2010 to 24 m in 2030 Establish a competitive base of infrastructure, human resources and regulatory frameworks Blue : SANRAL’s contribution
19
NDP: Critical Actions - toll roads Transport:
Public infrastructure investment at 10% of GDP (total 30% of GDP in 2030), financed through tariffs, PPPs, taxes, loans and focused on transport, energy and water. - toll roads Transport: Upgrade the Durban-Gauteng freight corridor - - (De Beers Pass) Expand capacity of coal, iron ore and manganese lines Build the N2 through the Eastern Cape Wild Coast (construction of bridges to commence in 3rd Quarter 2016) Public transport infrastructure and systems, including the renewal of commuter rail fleet, supported by enhanced links with road-based services. Blue : SANRAL’s contribution
20
MTSF: 14 Outcomes (2014) Quality basic education
A long and healthy life for all South Africans All people in South Africa are and feel safe Decent employment through inclusive growth Skilled and capable workforce to support an inclusive growth path An efficient, competitive and responsive economic infrastructure network Vibrant, equitable, sustainable rural communities contributing towards food security for all Sustainable human settlements and improved quality of household life Responsive, accountable, effective and efficient local government Protect and enhance our environmental assets and natural resources Create a better South Africa, a better Africa and a better world An efficient, effective and development oriented public service A comprehensive, responsive and sustainable social protection system A diverse, socially cohesive society with a common national identity
21
Alignment With Minister’s Performance Agreement
Maintenance, Strategic Expansion, Operational Efficiency of Transport Infrastructure: Through SANRAL’s non-toll and toll projects on the national road network SIP 2: N3 De Beers Pass – Responses of comments received from the public on the draft EIR being collated for submission to the Minister of Transport (MTSF: SANRAL commences work in 2015) SIP 3: Wild Coast Project: work on bridges expected to commence in November (MTSF: Wild Coast - SANRAL to have commenced construction of bridges in 2014) Integrated National Transport Plan: SANRAL has submitted comments. The additions relating to PICC and SIP projects are being reviewed for comments. Decent employment opportunities: Through SANRAL’s projects and SMME empowerment Comprehensive rural development: Through SANRAL’s projects in rural areas and access to national roads through Community Development Projects Protect and enhance environmental assets and natural resources: Through SANRAL’s environmental policies on projects
22
Nine Point Plan (SONA 2016) Cannot have an efficient economy or social cohesion without good roads Resolving the energy challenge SANRAL projects being done energy efficiently and with responsible and sustainable environmental practice Revitalising agriculture and the agro-processing value chain Provision of effective road transport infrastructure Advancing beneficiation or adding value to the mineral wealth More effective implementation of a higher impact Industrial Policy Action Plan Encouraging private sector investment Toll road portfolio including PPPs Moderating workplace conflict In blue: SANRAL’s contribution In grey: Not directly applicable
23
Nine Point Plan Unlocking the potential of SMMEs, cooperatives, township and rural enterprises SANRAL projects target: - SMME empowerment including women and youth - Job creation and training on the job - Community development: projects – access roads, pedestrian bridges - Skills development – scholarships, bursaries, internships State reform and boosting the role of SOCs, ICT infrastructure or broadband roll-out, water, sanitation and transport infrastructure. Continuing to deliver as an SOC Effective and efficient delivery of the national road infrastructure Intelligent Transport Systems (ICT) Operation Phakisa, which is aimed at growing the ocean economy and other sectors. Egress/access to ports and beyond In blue: SANRAL’s contribution
24
SANRAL: Strategic Outcomes Oriented Goals
Ensure an efficient, competitive and responsive national road network (MTSF Outcome 6: An efficient, competitive and responsive economic infrastructure network) Ensure improved road safety on the national road network (MTSF Outcome 3: All people in SA are and feel safe) Ensure improved rural access to the national road network (MTSF Outcome 7: Vibrant, equitable and sustainable rural communities) (MTSF Outcome 8: Sustainable human settlements and improved quality of household life) Ensure sound environmental management and sustainable practice on the national road network (MTSF Outcome 10: Environmental assets and natural resources that are well protected and continually enhanced) Ensure decent employment opportunities, transformation and empowerment (MTSF Outcome 4: Decent employment through inclusive economic growth) (MTSF Outcome 5: Skilled, capable workforce to support inclusive growth path) An efficient, effective and development oriented national roads agency (MTSF Outcome 12: An efficient, effective, development oriented public service)
25
STRATEGIC OBJECTIVES Manage the national road network effectively and efficiently Provide safe roads Carry out Government’s targeted programmes Co-operative working relationships with all spheres of Government and the SADC member countries Maintain good governance practice Maintain financial sustainability Pursue research, innovation and best practice Safeguard SANRAL’s reputation Pursue and maintain environmental sustainability and best practice
26
ANNUAL PERFORMANCE PLAN 2016/17 – 2018/19 (Summary)
Measures performance against targets linked directly to Strategic Objectives Manage the national road network effectively and efficiently Road condition indices Maintenance and capital projects kilometres SIP Projects Traffic information Provide safe roads Projects in pedestrian hazardous locations Road safety audits in design phase Road Safety education programmes
27
ANNUAL PERFORMANCE PLAN 2016/17 – 2018/19 CONT’D
Carry out Government’s targeted programmes Empowerment through award of contracts Job creation SMME Development Development of Human Capital Internal & External: employment equity, scholarships, bursaries, internships Community Development projects Cooperative working relationships with all spheres of Government and the SADC member countries COTO approvals Incident Management System across the country Work done through ASANRA: norms and standards Cooperation on the Botswana bridge
28
ANNUAL PERFORMANCE PLAN 2016/17 – 2018/19 CONT’D
Maintain good governance practice Prevention of Fraud and Corruption – Fraud hotline (Unqualified audit reports over the years) 6. Maintain financial sustainability Private sector investment index Expenditure efficiency – overheads Pursue research, innovation and best practice Road Design software Pedestrian behaviour
29
ANNUAL PERFORMANCE PLAN 2016/17 – 2018/19 CONT’D
8. Safeguard SANRAL’s reputation Positive messaging Publications Stakeholder engagement 9. Pursue and maintain environmental sustainability and best practice Environmental management
30
KEY PRIORITIES FOR 2016/17 Asset Management Systems for the timely maintenance of national roads Planned increase of national road network by incorporation of roads as requested by Provinces Good co-operative relationships with relevant government departments, provincial and municipal authorities – sharing of asset management systems across jurisdictions Smooth management of e-Tolling in Gauteng Roll out of electronic lanes at current plazas for quicker flow of vehicles - ongoing N1-N2 Winelands Toll Road, Western Cape N2 Wild Coast Toll Road, Eastern Cape (MTSF – Commence 2014) N3 De Beers Pass, Free State, KZN (SIP-2. MTSF – Commence 2015)
31
TRANSFORMATION: Support Tertiary Institutions
Chair in Pavement Engineering: University of Stellenbosch Chair in Transport Planning: University of Cape Town NMMU Exposure & school visits to ICT lab 2148 learners 23 Educators University of Witwatersrand WTTP Grade 10-12 2015/16 – 50 learners University of Free State ICT Grade 10-12 ICT Lab Science Programme: 341 learners 26 education students Family Math & Science Grade R-3 learners: , educators: 255, parents: 7 512 University of the Free State – The SANRAL Chair in Maths and Science
32
TRANSFORMATION Sub-Contractor Procurement Conventional Projects: CPG
Contract participation goals (CPG) for Type A projects, i.e. plant and materials intensive, e.g. Reseals. Targeted Labour Percentage Goals 4% min 30% women (of 4%) 30% youth (of 4%) (˂ 35yrs) Targeted Enterprise Percentage Goals 15% min 20% women (of 15%) 20% youth (of 15%) Targeted Enterprise Categories CIDB 2CE to 7CE
33
TRANSFORMATION Sub-Contractor Procurement Cont’d Conventional Projects: CPG
Contract participation goals (CPG) for Type B projects, i.e. upgrades, rehabs, new construction. Targeted Labour Percentage Goals 6% min 30% women (of 6%) 30% youth (of 6%) (˂ 35yrs) Targeted Enterprise Percentage Goals 20% min 20% women (of 20%) 20% youth (of 20%) Targeted Enterprise Categories CIDB 2CE to 7CE
34
TRANSFORMATION Main Contractor Procurement RRM Projects
New RRM contract percentage allocation: Group A B C D Enterprise Contractor <51% black people equity >51% black people equity Black Women or Youth owned entity JV with Black Women or Youth owned entity Max 20% of work Max 40% of work Max 60% of work Max % = Max% for Group A or B + % JV share of smaller entity =80% Targeted Enterprises(subletting) Min 80% of work Min 60% of work Min 40 % of work Min 20 % of work
35
TRANSFORMATION: Community Development Contracts
Labour and SMME Based Contracts SANRAL contracts with a Training Service Provider (TSP). TSP tenders for training, mentoring, management. TSP does not tender for construction of the works. 90% of work is constructed by Local Labour and SMMEs. 10% of work typically requires larger plant, etc. 90% of SMMEs must be black owned. 40% of SMMEs must be woman owned. 40% of SMMEs must be youth owned. All SMMEs/labour recruited from the local community
36
Black Owned Enterprises Appointed by SANRAL
2014/2015 Total SMMEs Black SMMEs % Black SMMEs Count R’000 Rand 1 697 765 45% 60% 2015/2016 (30 Mar 2015) 1 993 974 49% 54%
37
Woman Owned Enterprises Appointed by SANRAL
Year Number Value (R) 2014/2015/2016 (mid year) 324 Woman Owned Enterprises Appointed Size Distribution N/A Medium Small Very Micro CIDB 6 – 7 5 3 – 5 1 - 3 64 39 82 45 94
38
Changes to the Strategic Plan
New Strategic Objective (No. 9) added: Pursue and maintain environmental sustainability and best practice Target for percentage of RRM project spend contracted to SMMEs and black owned companies and in terms of black ownership of the main contractor has been increased from 60% to 65% Target for number of SMMEs working for SANRAL has been increased from 800 to 1200 for 2016/17 and incrementally in the following years. The target for the number of scholarships offered has been increased from 150 to 200 The Expenditure Efficiency Index target was reduced from less than 7.5% to less than 10% due to reduced expenditure on toll projects given the uncertainty with regard to the ‘user-pay’ principle.
39
CHALLENGES Going-concern status of SANRAL due to poor collection on GFIP e-toll project Delays in implementation of critical projects: N1-N2 Winelands, N3 De Beers Pass – Loss of opportunity N2 Wild Coast expected to commence in late 2016, 15 years later than originally planned Need firmly communicated message on toll road funding Shortfalls contractually paid by Government. Unnecessary burdens on borrowings. Inadequate law enforcement: Traffic rules Overloading by hauliers Compliance in relation to electronic tolling Driver and pedestrian behaviour – road safety
40
CHALLENGES CONT’D Ratings review for downgrade: Lack of enforcement is a key factor Quote from Moody’s Ratings Report: “UNCERTAINTIES REGARDING THE ENFORCEMENT OF E-TOLL REVENUE COLLECTIONS SANRAL's power to collect e-tolls is underpinned by legislative instruments including the SANRAL Act no 7 of 1998, and the Transport and Related Matters Amendment Act of 25 September Although the legislation is in place to prosecute offenders and to issue civil summonses, there has to date been no enforcement to collect the outstanding e-toll arrears. Further to the existing legislations the government is planning to make the renewal of vehicle license discs contingent upon the payment of e-toll arrears. This will not take effect for up to 18 months. There is uncertainty over whether these measures will be enforced. We believe a lack of enforcement is a key contributor to persistently low e-toll collection rates.”
41
CHALLENGES CONT’D Insufficient funding for timely upgrades and maintenance of the non-toll network Insufficient high-level planning and co-ordination between inter-modal transport and the three spheres of Government Delays in project related approvals from authorizing departments and provinces SIP-4: Reports received are often not consistent or verified and are delayed. Increased transparency would be beneficial
42
ANNUAL PERFORMANCE PLAN: Programme 1: Strategic Objective 1: Manage the national road network effectively and efficiently Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 1.1 Smooth Travel Exposure (STE) Quarterly 96.12% 95% 1.2 Low Rut Exposure (LRE) 91.74% 99.44% 1.3 High Texture Exposure (HTE) 98.51% 1.4 Bridge Condition Exposure (BCE) 90% 1.5 Routine Maintenance km 21403 21452 21579 1.6 Periodic Maintenance km Annual 851 850 900 1.7 Strengthening km 687 400 450
43
Programme 1: Strategic Objective 1: Manage the national road network effectively and efficiently
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 1.8 SIP-1 Annual Maintenance of N1, N4, R33, R510, R511 and R520 National Roads to Lephalale Annual New 885 1.9 SIP-4 Annual Maintenance of National Roads in North West Province (km) 2598
44
Programme 1: Strategic Objective 1: Manage the national road network effectively and efficiently
Programme Performance Indicator Reporting Period Actual 2014/15 Base-line Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 1.10 Traffic information collection and dissemination on FMS (Freeway Management System) network Quarterly New Collection of real time information on 100% (225 km) of the FMS network for design purposes 75% of informati-on on 50% of FMS network to be collected Informat-ion on the full 225 km is being collected Collection of real time information on 50% (225 km) of the FMS network for design purposes
45
Programme 2: Strategic Objective 2: Provide safe roads
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 2.1 Identify, investigate and propose remedial measures at twelve pedestrian hazardous locations Quarterly 18 Pedestrian Hazardous Locations Identified investigated and remedial measures proposed identify, investigate and proposal of remedial measures at twelve pedestrian hazardous locations per region per year Twelve pedestrian hazardous locations per region: Investigation: 100% Proposal of remedial measures: 50% Proposal of remedial measures: 40% Identify, investigate and propose remedial measures for 12 pedestrian hazardous locations per year 2.2 Road safety audits completed for upgrade and/or improvement projects in the Project Detail Design Phase New 4 Audits 75% progress in road safety audits 75% progress in 4 road safety audits 4 audits
46
Programme 2: Strategic Objective 2: Provide safe roads
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 2.3 Road safety education and awareness programmes at selected educational districts in a 5km radius of the national network and linked to SANRAL construction projects Semi-Annual New 15 educational district 15 educational districts
47
Programme 3: Strategic Objective 3: Carry out Government’s Targeted Programmes
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 3.1 Percentage of RRM project spend contracted to SMMEs and Black owned Companies Quarterly 83% >60 % 86% >65 % 3.2 Percentage of other than RRM project spend contracted to SMMEs and Black owned Companies 48% >35 % 45% 3.3 Jobs created on project (Full- time) 19820 20 000 15 000 14 458 21 000 3.4 SMMEs 1697 800 1200 3.5 Internships 217 110 100 223 121 3.6 External Bursaries 105 85 84
48
Programme 3: Strategic Objective 3: Carry out Government’s Targeted Programmes (Cont’d)
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 3.7 Scholarships Quarterly 368 150 196 200 3.8 Employment Equity Plan Annual New EE Plan approved by Board. Target for 31 March 2015 achieved Achieve annual Targets as per Board Approved EE Plan Achieve annual targets as per Board approved EE Plan
49
Programme 3: Strategic Objective 3: Carry out Government’s Targeted Programmes (Cont’d)
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 3.9 Community Developme-nt Projects (CDP) Semi-annual 14 projects (4 from the Northern region, 9 from Eastern Region and 1 from the western Region).Have been approved by the budget Committee. The projects were placed on the budget approved by the board and registered 12 projects in construction
50
Programme 4: Strategic Objective 4: Co-operative working relationships with all spheres of Government and SADC member countries Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 4.1 COTO sub-committee meetings chaired by SANRAL Annual 2 Meetings held for Road Asset Management Systems (Rams) and RMC( Road Materials Committee & Structures. At least two meetings to be held At least 2 meetings to be held 4.2 Revise TRH/TMH guidelines through COTO sub committees and submit to COTO for approval. New TMH3, TMH8, TMH9, TMH13, TMH 14, TMH18, TMH19, TMH22 TRH3, TRH4, TRH8, TRH12
51
Programme 4: Strategic Objective 4: Co-operative working relationships with all spheres of Government and SADC member countries Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 4.3 Revision of the COTO standard specification-ions for road and bridge works Annual New 50% 100% 4.4 Botswana Border Bridge (Notwane River) 34% construction completed. 75% construction completed 100% constructi-on completed
52
Programme 4: Strategic Objective 4: Co-operative working relationships with all spheres of Government and SADC member countries Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 4.5 National Technical Committee to formulate national standards to harmonise communication of responding sectors to incidents and produce 4 Incident Management System reports for COTO Quarterly New Production of 4 IMS reports for COTO Produce 3 IMS reports for COTO Target Achieved 4 IMS Reports completed and presented to COTO via NDOT
53
Programme 5: Strategic Objective 5: Maintain good governance practice
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 5.1 Fraud Hotline Quarterly Reported incidents to be investigated or under investigation with action taken or not being taken as appropriate 94% of all incidents have been investigated and closed. Reported incidents to be investigated and action to be taken as appropriate. Reported incidents have been investigated or are under investigation and action taken/being taken as appropriate.
54
Programme 6: Strategic Objective 6: Maintain Financial Sustainability
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 6.1 Private Sector Investment Index (PSII) Quarterly 18.16% >20 % >20% 19.68% >18% 6.2 Expenditure Efficiency Index (EEI) 4.31% < 7.5% 5.54% <10%
55
Programme 7: Strategic Objective 7: Pursue research, innovation and best practice
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 7.1 Complete the development and testing of the SARDS( SA Road Design Software) Portal (%complete) Annual New 50% 75% 7.2 Number of formalised SA Road Design Software (SARDS) training courses presented to users, and user certification Annual New 1 4
56
Programme 7: Strategic Objective 7: Pursue research, innovation and best practice
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 7.3 3 year longitudinal study to determine the knowledge and behaviour of road users in selected areas Annual New 33% 66%
57
Programme 8 :Strategic Objective 8: Safeguard SANRAL’s reputation
Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 8.1 Communication: promote awareness of SANRAL’s mandate and contribution to society. Quarterly 15 positive messages were published on average in National / regional press - documented in monthly reports Profile at least six positive messages in national/regional press (print, broadcast or online) per month 10 positive messages were profiled in national/regional press (print, broadcast or online) per month 8.2 External Publications (By The Way) Semi-annual Two issues of By The Way” publications were released in December 2014 and March 2015 Publish two issues 8.3 Stakeholder engagement 6 round table discussion were held during the year Hold Four round-table discussions
58
Programme 9: Strategic Objective 9: Pursue and maintain environmental sustainability and best practice Programme Performance Indicator Reporting Period Actual 2014/15 Baseline Annual Target 2015/16 Quarterly Targets Achieved Target 2016/17 Quarter 3: 31 December 2015 9.1 Undertake 6 environmental applications in-house for the 3 year period (10 over 5 year period) and submit them for external review and / or decisions Annual New Undertake 2 environment-al authorisati-on applications in-house, submit for external review and/ or for final decision. Undertake 2 environment-al authorisation applications in-house, submit for external review and/or for final decision
59
Thank you! FRAUD HOTLINE: 0800 204 558 Nazir Alli alli@nra.co.a
SANRAL 48 Tambotie Avenue Val de Grace Pretoria 0184 PO Box 415 0001 Telephone: Fax: Nazir Alli Inge Mulder Alice Mathew FRAUD HOTLINE: Website:
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.