Download presentation
Presentation is loading. Please wait.
2
ePermitting Roofing System
Boris Sursky LEED AP BD + C
3
The e-Roofing Permitting System is the WINNER of the prestigious NATIONAL ROOFING CONTRACTORS ASSOCIATION 2003 GOLD CIRCLE AWARD for service to industry.
4
The e-Roofing Permitting System is the WINNER of the 2004 NATIONAL ASSOCIATIONS OF COUNTIES AWARD FOR INTEGRATING PROCESSES AND SERVICE: ROOFING/STORM PANEL PERMITTING AND SERVICES SYSTEM
5
The e-Roofing Permitting System provides progressive and improved customer service through the use of advanced technology.
6
The e-Roofing Permitting System is an revolutionary permitting application process, with tens of thousands of Roofing permits issued since 2004.
7
The e-Roofing Permitting System was put to the test after Hurricane Wilma which occurred in 2005, when over 12,000 e-Roofing permits were issued in a 12 month period using this system.
9
CLICK HERE
10
CLICK HERE
11
CLICK HERE
12
CLICK HERE
13
CLICK HERE
14
CLICK HERE
15
ENTER TRADESMAN NUMBER
16
Contact Contractor’s Section for assistance with Tradesman Number.
18
CREATE USER PROFILE
19
CLICK HERE
23
CLICK HERE
24
Enter: Roofing (CCC) Contractor License Number
26
2 units required for duplexes
27
Use total ft² “NOT 2 Roofing Squares”
CLICK HERE
29
Select Low Slope Manufacturer
31
Do Not Use Fractions
37
Minimum 2/12” ROOF SLOPE required for shingles
38
ROOF MEAN HEIGHTS CAN NOT EXCEDE 33 FT.
39
Note: Prescriptive fastener spacing
40
Note: Online Review was not
approved. This happens after 2 code related rejections An example of a code related rejection, would be an incorrect roof slope or roof mean height.
44
All Dispositions required to be approved prior to paying for permit
45
Note: Provide a completed Owner’s Notification Form at the jobsite to be collected by the inspector and submitted to Micro-Film as part of the permit record.
47
Print completed roofing application forms for jobsite inspections
48
ePermitting NO NO’s Use total ft² on permit application, do not use roofing squares (1=100 s.f.) No Florida Product Approvals allowed, only use current Miami-Dade County Product Approvals with the ePermitting System
49
ePermitting NO NO’s Do not use fractions when inputting data, use only decimal numbers Use correct slope for specific roof system types, for example a minimum 4/12 slope is required for mechanically attached tiles
50
ePermitting NO NO’s NO CHANGES CAN BE MADE TO the “ePermitting System generated Uniform Permit forms. Changes to system generated forms require a permit revision.
51
DO NOT SHARE YOUR PASSWORD TO ACCESS THE “ePermitting” SYSTEM
ePermitting NO NO’s DO NOT SHARE YOUR PASSWORD TO ACCESS THE “ePermitting” SYSTEM WITH ANY ONE YOU DO NOT TRUST! PERMITS CAN BE OBTAINED WITHOUT YOUR KNOWLEDGE!
52
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
A completed Section 1524 Owner’s Notification Form to be collected by Inspector and placed in Micro-Film
53
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
Completed Section A & B page including a roof plan diagram. Total roof area to be field verified by inspector & shall match paid permit fees. The completed roof plan diagram shall included dimensions, roof sections, levels and roof types.
54
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
Printed copy of the “ePermitting” system generated Uniform Roof Permit Form for the types of roof systems to be installed. Category 92 Low Slope BUR Category 95 Shingles Category 107 Tile
55
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
One copy of the Miami-Dade NOA Product Approval for the proposed roof system(s) to be installed
56
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
Low Slope BUR NOA Approval including Cover Page, System Page(s), Limitation Page(s) Class “A” Fire Directory Listing for the Low Slope BUR
57
REQUIRED DOCUMENTS FOR JOB SITE INSPECTION
Tile NOA Product Approval Tile Underlayment NOA Product Approval Tile Adhesive or Mortar NOA Product Approval
58
“ePermitting” Improvements CATEGORY 107 TILE ROOF SYSTEMS
59
New Tile Underlayment Selections
Prescriptive 30/90 hot mopped Modified Bitumen hot mopped with a required NOA Product Approval for tile underlayment Self Adhered Modified Bitumen with a required NOA Product Approval for tile underlayment
61
Select Tile Mechanical Attachment Method
62
Select Mortar Attachment Type
63
Select Adhesive Attachment Type
64
Adhesive Type Selected, Note Exposure Category Selected
EXPOSURE CATEGORY D IS TYPICALLY OCEAN LINE
65
Select Roof Deck Type
66
Select Base Sheet Type
67
Prescriptive Tile Underlayment Selected
68
Modified Bitumen Hot Mopped Tile Underlayment
69
Self Adhered (S/A) Underlayment
70
I Agree Statement
71
SAMPLE NOA LIMITATIONS
72
SAMPLE NOA LIMITATIONS
73
SAMPLE NOA LIMITATIONS
74
SAMPLE NOA LIMITATIONS
75
Tile Roof System Shall comply with RAS 118, 119, 120
CLICK HERE
76
Self Adhered Underlayment Selected
Note: Yes “I AGREE” STATEMENT SELECTED
77
Note: Attachment Method
78
Note: That the calculated attachment
resistance in P3 is greater than attachment resistance found in the NOA
79
Note: Attachment Method
80
Note: That the calculated attachment
resistance for all roof zones are LESS than the attachment resistance found in the Tile NOA.
81
Submit Review if Application is Complete
CLICK HERE
82
Approved Application
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.