Town Informational Meeting 19 April 2017 CTDOT Bridge #04609 (Pleasant Valley Rd) CTDOT Bridge #04610 (Carter Hill Rd) CTDOT Bridge #04119 (Kelseytown Rd) Waterside Lane Bridge Hurd Rd Bridge RT 81 Sidewalk (HS) Extension DPW Diesel Fuel Farm Replacement
2
Projects Need 4/19/17
3
Pleasant Valley Road Bridge
Complete Replacement Soft Costs (Admin./Eng.) $ M Bridge/Roadway $ 1.1 M Contingency $ M TOTAL = $ 1.6 M* Approximately (50%) Reimbursed thru the State Local BRDG Program Schedule: Construction 2018 4/19/17
4
Carter Hill Road Bridge
Complete Replacement Soft Costs (Admin./Eng.) $ M Bridge/Roadway $ M Contingency $ M TOTAL = $ M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17
5
Kelseytown Road Bridge
Complete Superstructure Replacement/Substructure Rehab Soft Costs (Admin./Eng.) $ .45 M Bridge/Roadway $ 2.4 M Contingency $ M TOTAL = $3.05 M* Approximately (80%) Reimbursed thru the State/Federal BRDG Program Schedule: Construction 2019/20 4/19/17
6
Waterside Lane (Town Beach) Bridge
Superstructure & Substructure Rehab Soft Costs (Admin./Eng.) $ 12 K Bridge Rehab $ 45 K Contingency $ 9 K TOTAL = $ 65 K* * All Town Funds Schedule: Construction 2018 4/19/17
7
Hurd Bridge Road Bridge
Complete Replacement and/or Rehabilitation Soft Costs (Admin./Eng.) $ M Bridge/Roadway $ M Contingency $ M TOTAL = $ 1.5 M* * All Town Funds Schedule: Construction 2020 4/19/17
8
Sidewalk Extension Rt 81 to The Morgan School
New Sidewalk from the northerly terminus (on the East Side of Rt 81) to the new High School (Southerly Egress) Soft Costs (Admin./Eng.) $ K Construction $ 600 K Contingency $ K TOTAL = $ 750 K* * All Town Funds Schedule: Construction 2018 4/19/17
9
DPW Diesel Fuel Farm Replacement
Underground fuel storage tank (UST) has reached it’s useful/permitted life. Replacement must be completed by the summer of 2018 Soft Costs (Admin./Eng.) $ K Construction $ 295 K Contingency $ K TOTAL = $ 370 K* * All Town Funds Schedule: Construction 2017/18 4/19/17
10
4/19/17
11
4/19/17
12
Cost Summary 4/19/17
13
THANK YOU! Questions? 4/19/17