Gas Utility Operations Best Practices Program
October 14-16, 2014 Gas Utility Operations Best Practices Program Leak Management Roundtable Detroit, MI Group Discussion Summary – TOPIC A: Quality Assurance and Performance Measures Facilitator – TBD
2
Note: The AGA Operations Best Practices Program is intended to highlight how particular companies may address a specific operational issue and may not include all of the data related to a highlighted practice. The need to implement and the timing of any implementation of highlighted practices will vary with each operator. Each operator serves a unique and defined geographic area and their system infrastructures vary widely based on a multitude of factors, including, condition, engineering practices and materials. Each operator needs to evaluate highlighted practices in light of their system variables. Not all highlighted practices will be applicable to all operators due to the unique set of circumstances that are attendant to their specific systems. Companies are not ranked through this program and no one practice is identified as the best for a particular topic. The information herein represents an unaudited compilation of information and could contain coding or processing errors. Anyone using this document should rely on his or her own independent judgment or, as appropriate, seek the advice of a competent professional. References to work practices, products or vendors do not imply an opinion or endorsement by AGA or a responding company. This document is not intended to provide legal advice or opinions. As always, you should consult your legal counsel for advice based on the law and your company’s specific facts and circumstances. Copyright & Distribution: Copyright © 2013 American Gas Association. All rights reserved. The AGA Gas Utility Operations Best Practices Program publications are copyrighted, confidential and proprietary to AGA and only available on the member-restricted side of the AGA website. Permission to reproduce or transmit in any form or by any means, electronic or mechanical, including photocopying or recording, or by any information storage and retrieval system any publication or portion of a publication must be obtained in writing from the AGA General Counsel’s Office, AGA Full, Limited and International Members are granted a limited license to reproduce this publication for internal business purposes but not for regulatory or civil matters.
3
What QA program elements do you implement in your LM Program?
Field Verification of Leak Survey Most Company's perform quality checks 10% to 20% Oklahoma Natural Gas performs 1% audit also GPS bread crumb technology DTE Retirees are doing QA checks DTE and ATCO uses ISO for the process only
4
What QA program elements do you implement in your LM Program?
Field Verification of Leak Survey Columbia Gas does 1% audit of survey within one month Columbia Gas monitors monthly. If the contractors will not renew contract Electronic method is used by Columbia Gas for QA survey 1% Columbia Gas on finding defects in survey will call the contractor back out
5
What QA program elements do you implement in your LM Program?
Environmental conditions Most company’s do not survey when the frost is in the ground. Two company’s Excel and DTE do Excel and DTE resurveyed because of the harsh winter One Gas will not survey in snow pack Contractors will go home without pay if no work due to inclement weather
6
What QA program elements do you implement in your LM Program?
Performance Measures for each Leak Surveyor PGE monitors services and main footage completed per day Most Company’s check leak detection daily / weekly/ monthly Columbia Gas did two surveys this year because of the weather Northwestern Energy - Montana will monitor by feet per hour for performance. Also complete all under ground leaks by frost 1800 feet per hour range
7
What QA program elements do you implement in your LM Program?
Notification to leak surveyor of active leaks in the area One session: Most company’s will give the contractor / employees the active leaks BUT Another session: Most company’s send the survey crew with out the knowledge of leaks One Gas uses GPS
8
What QA program elements do you implement in your LM Program?
QA program conducted in-house or by contractor Gas Metro uses all in house labor All company’s will monitor the contractor’s program. Each one does at different level. Some will go by timing (the time to complete) , a designated percentage after completion. One company uses an outside contractor to do the inspections Columbia Gas performs audits by group of employees that does nothing but QA audits A mix of employees and contractors are used
9
What QA program elements do you implement in your LM Program?
Calibration of gas leak investigation instrumentation Calibration of equipment is done daily
10
What QA program elements do you implement in your LM Program?
OQ Excel Contractor is required to have the OQ date on their ID tag Columbia Gas has OQ date on ID card Questar employees are required to carry a card of Employee qualifications
11
What QA program elements do you implement in your LM Program?
Consequences of a failed leak survey observation All Company’s will retrain and disqualify the employees through OQ Stand down meetings are performed with the employees Excel-Monthly score cards are shared with employees
12
What Performance Measures are applied to your Leak Surveyors?
Performance Measures different for in-house vs. contractor leak surveyors? No. The measures are the same regardless of who is performing the survey All metrics are equal for contractor and in house employees
13
What Performance Measures are applied to your Leak Surveyors?
Measurement of Leak Surveyor Productivity Number of services and main footage completed daily The number of leaks projected vs found GPS data to track paths
14
What Performance Measures are applied to your Leak Surveyors?
Incentives for employee or contractor leak surveyors Until -will pay an incentive for early completion Most pay by unit / footage Alagasco / Houston – pays an incentive Questar contractor offers some type of incentive to their employee Central Hudson will give a incentive to finish early Due Sept 15 if they finish Sept 1st they get an incentive. If they finish Sept 30th they get penalized.
15
What Performance Measures are applied to your Leak Surveyors?
Miscellaneous Issues In the last year seems to be high turnover in the contractor for surveyor - consensus by most Regulators are changing. Getting tough
16
What Performance Measures are applied to your Leak Surveyors?
Miscellaneous Issues PECO, Columbia Gas, UGI and DTE Grade four / three leaks are retimed yearly. One Gas does not Peco, Columbia Gas , DTE Northwestern Energy Commission will walk with the survey crew Peco has 10 contractor employees doing survey Excel and UGI- rechecks all leak repairs after completion Columbia Gas pin point their own leaks
17
The American Gas Association, founded in 1918, represents more than 200 local energy companies that deliver clean natural gas throughout the United States. There are more than 71 million residential, commercial and industrial natural gas customers in the United States, of which 92% — more than 65 million customers — receive their gas from AGA members. Today, natural gas meets almost one-fourth of the United States’ energy needs.