1 Team 02 Sub-par engineers
Justin Brink Ryan Byma Josh DeYoung Jarod Stuyvesant 11/22/2018 Oral Presentation I

2 Team members Justin Brink Jarod Stuyvesant Ryan Byma Josh DeYoung
Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

3 Project introduction Project Location Team Introduction
Location in relation to Calvin About 3 miles south on the Beltline Plaster Creek runs through the site The low area around the creek has the most problems and is the focus of our project Project Location Team Introduction Project Introduction Christian View Status Update Players 11/22/2018 Oral Presentation I

4 Project Introduction The Client The Problem
Christian Recreation Center (CRC) Graham Rayburn Master Plan The Problem Plaster Creek Drainage Soil Erosion Bridges Importance CRC developed a Master Plan in the past year or so addressing some of these problems 3 photos from Long Range Planning Committee Master Plan Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

5 Goals and objectives Decrease time before golfers are back on the course after flood 24 – 36 hrs rather than 72 Control erosion along Plaster Creek Repair existing bridges Center around the: Flooding, Erosion, Bridges Flooding : Goal is to get golfers back on the course within hours Erosion: Minimize erosion along the bank caused by heavy storm events and around the bridges on Plaster Creek Bridges: Repair bridges so failure is not Imminent as the bridges on the course are nearing the end of their design life expectancy Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

6 players Christian Recreation Center City of Kentwood
Michigan Department of Environmental Quality (MDEQ) Plaster Creek Stewards CRC Client City of Kentwood Permitting Codes and ordinances Michigan Department of Environmental Quality (MDEQ) Wetlands 100 yr Floodplain Plaster Creek Stewards Knowledge about the creek Dealt with these issues before Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

7 How Christian faith plays
Following call to be tenants and stewards in God’s earth (Leviticus 25) Honest procedure in following policies (i.e. not avoiding DEQ) Design Norms Transparency Integrity Trust PLS -> We too are called to be tenants in God’s earth Lev 25: God says,“the land is mine and you reside in my land as foreigners and strangers.” DN: Transparency – We want to be good communicators with full disclosure with both the client and other involved agencies. Integrity – We want to provide solutions that will create a more enjoyable and healthy atmosphere while on the course and around the creek. Trust – We want to build sound relationships with our client. Our solutions should also have a lasting and real effect, and hold to our goals. Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

8 Status update Graham Rayburn/CRC Topographic map Kentwood
Information and research Alternatives - continue talking with Graham as we move forward Have obtained information including a topo map and some as built designs of bridges Met with city of Kentwood, will look to bring some of our ideas to the DEQ We will then continue to bunker down and gather more information as it is available and research We will provide alternative designs and ideas Team Introduction Project Introduction Players Christian View Status Update 11/22/2018 Oral Presentation I

9 Questions 11/22/2018 Oral Presentation I