Download presentation
Presentation is loading. Please wait.
1
USS MISSISSINEWA (AO 59) Oil Offloading Operations Ulithi Atoll, FSM February 2003
2
NAVSEA SUPSALV Mission
Responsible for technical support to Fleet in areas of: Marine Salvage Diving Underwater Search & Recovery Offshore Oil Spill Response Underwater Ship Husbandry Maintains salvage contracts to augment Fleet capability Maintains ESSM System (pre-positioned emergency ship salvage and pollution response material)
3
ESSM Gear in action
4
Sinking of the Mississinewa
November 20, 1944 63 U.S. personnel lost 3,780,000 gallons of oil on board at sinking Sunk in 130 feet
5
USS Mississinewa at Ulithi Atoll
Yap State, Federated States of Micronesia Ulithi Atoll
6
Recent History Wreck located April 2001
Oil reported leaking, August 2001 YAP, FSM & USCG / NOAA Survey First Navy Response – Patch & Pump (Aug 2001) Second Leak & Response (Dec-Jan 2001)
7
Need for Additional Response (Offloading)
Risk of Continued Intermittent Oil Leaks Risk of Future Catastrophic Oil Release Wreck’s 22 tanks contained estimated 2.8 M gallons of oil Proximity to Pristine Subsistence Fishing Grounds Sea Turtles, Marine Birds, Intertidal and Subtidal Habitats
8
Offloading Plan Oil Removal - Through the hull – “Hot Tap” Equipment
Surface-supplied (air) Diving Proven Tools and Equipment Aggressive Search for Oil Personnel Safety Environmental Safety Hot Tap System
9
Logistics – Getting to the site
10
Operational Criteria Independent vessel-based operation (no facilities ashore) Need to remain on-station until completion Minimize pollution risk Remove all pumpable oil in accessible tanks Proper disposal of oil and all wastes
11
Pumping Arrangement – Option One
“Donut Pump” Sampling & Monitoring Station Manifold Hot Tap Valves
12
Resources Vessels USS Salvor (ARS 52) – Navy diving support platform Primary support barge & tug Additional barge and tug Personnel – Salvor, MDSU, EODMU, SUPSALV & contractors Equipment - supplied by ESSM (hot taps, pumps, etc.) Diving - surface-supplied; recompression chamber; communications (Salvor, MDSU, & EOD MU 5) Pollution response equipment (ESSM)
13
Response Vessel - Barge Fels 20 loaded with ESSM salvage and oil recovery gear
6 ea 4-man bunk vans ea Office/Rec van ESSM vans (Cleaning/Decon, POL Pumping, POL hose) 2 (blue) Singapore ESSM equpt vans (1 ea 400 amp welder, 3 ea 125 cfm compressors, 2 clyde winches, 3 ea 30kw generators, 2 light towers & light kits, 2 ea beach gear ground tackle, extra crown buoys 1 Singapore ESSM van w/ 4 ea 10’x50’ fenders 3 ESSM vans (Debris boat, Salvage Skim van, POL Support (Hot Taps, etc.) 2 Canvas-covered trash vans (not yet loaded here) w/ other Singapore ESSM gear 3 twin drum mooring Winches - 2 Marine Sanitation Devices w/ plumbing On Salvor – Shop Van, Cleaning Van, 24’ RHIB, 23’ Zodiac, 2 ea 6,000# Stato Anchors
14
Oil Spill Mitigation Spill Response Plan Containment Oil Recovery
Dispersant Plan Wildlife Plan Storage & Disposal V-Boom Skimming System Dispersant Spray System Dispersant Package
15
Installing the 6-point moor
16
Vessels Operational Configuration
CO reports Salvor complement: 13 MDSU, 2 EOD Guam, 92 Salvor – total 107 mustered. SUPSALV – 1 SUPSALV Rep, 1 Yap Rep, 15 GPC, 20 Rover/Fels20, 12 Marlin – total (total on-scene – 156)
17
Diver training to use Hot-Tap pumping system - Honolulu
Divers topside – Ulithi during operation
18
Underwater Operations
19
Pumps
20
Pumping Operations
21
Operational Summary Installed 20 Hot Taps & Secured with Caps after Pumping Cut Access into Two Tanks for Internal Tank Access (& Secured) Removed All Accessible Oil from 21 Tanks, Engine Room, Pump Room, and Previously-Leaking Piping Transferred Approximately 1.95 Million Gallons of Oil from Mississinewa to Barge, including approximately 7% Free Water Successfully completed ahead of schedule Est. less than 5 gallons of Oil Released – No Environmental Impact Mississinewa Oil to be Sold in Singapore and Recycled