Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress of Horticulture Development Schemes Presented by B. L. Jat Assistant Director Horticulture, Jaipur.

Similar presentations


Presentation on theme: "Progress of Horticulture Development Schemes Presented by B. L. Jat Assistant Director Horticulture, Jaipur."— Presentation transcript:

1 Progress of Horticulture Development Schemes Presented by B. L. Jat Assistant Director Horticulture, Jaipur

2 Major Scheme being implemented: 1.National Horticulture Mission 2.National Mission on Micro Irrigation 3.Rashtriya Krishi Vikas Yojana

3 Scenario of Horticulture in Jaipur district : Area and Production: Crop group 2009-10 Area in ha.Prod. in MT Fruits 1020- Vegetables 2827963958 Spices 39703623 Flower 365326 M&A Plants 1825 Total 3365267932

4 Scenario of Horticulture in Jaipur district : Major Crops: Crop groupMajor Crops Fruits Aonla, Lime, Pomegranate, Bael, Ber, Mango Vegetables Tomato, Chilli, Brinjal, Okra, Cucurbits, Cabbage, Cauliflower, Pea, Carrot, Radish, Spinach Spices Fenugreek, Chilli Flower Merigold, Gailiardia, Roses ( Desi and Dutch) M&A Plants Aloe vera

5 Scheme wise Financial Progress : S.N o Scheme2009-102010-112011-12 Tar.Ach.Tar.Ach.Tar.Ach.* 1National Horticulture Mission 687.0451.0682.0484.0717.0112.00 2National Mission on Micro Irrigation 939.23858.01282.01659.01888.0987.15 3Rasthtriya Krishi Vikas Yojana 130.00 279.0279.00207.5074.25 Fin. in lac Rs. * Exp. of 2011-12 is including the booking amount

6 Scheme wise Progress : 1. National Horticulture Mission S.N o ComponentProgress 2009-10 Progress 2010-11 Provision 2011-12 Phy.Fin.Phy.Fin.Phy.Fin. 1New Orchard Establishment a. High Density Plantation (ha.)--4811.215012.00 b. Normal Plantation (ha.)9912.4916624535058.20 2Spices Development ( ha.)1003.581002.8720011.00 3Water Harvesting Structures a. Community WHS ( Nos.)35350.070262.5050187.5 b. Individual WHS ( Nos.)--106.00159.00 Fin. in lac Rs.

7 Scheme wise Progress : 1. National Horticulture Mission S.N o ComponentProgress 2009-10 Progress 2010-11 Provision 2011-12 Phy.Fin.Phy.Fin.Phy.Fin. 4Green House Cultivation ( Nos.)929.252546.75523.30 5Low Tunnel ( SqM)--460005.06500007.50 6Vermi Compost Unit a. Permanent ( Nos.)103.00103.0103.00 b. HDPE ( Nos.)--150.75 7Integrated Pest Mgt. ( Ha.)2902.012502.502002.00 Fin. in lac Rs.

8 Scheme wise Progress : 1. National Horticulture Mission S.N o ComponentProgress 2009-10 Progress 2010-11 Provision 2011-12 Phy.Fin.Phy.Fin.Phy.Fin. 8.Horticulture Mechanisation a. Power Operated PP Equipments ( Nos.) --40.7540.70 b. Power Operated Machines above 20 HP --710.501015.00 9Onion Storages ( Nos.)--2412.00200100.0 10Fruit Ripening Units in Nos.--2-2- Fin. in lac Rs.

9 Scheme wise Progress : 2. National Mission on Micro Irrigation S.N o ComponentProgress 2009-10 Progress 2010-11 Provision 2011-12 Phy.Fin.Phy.Fin.Phy.Fin. 1Drip Irrigation in ha. 971610.01106933.09021086.0 2Sprinkler Irrigation in ha. 4930247.08472460.04000318.0 Fin. in lac Rs.

10 Scheme wise Progress : 3. Rashtirya Krishi Vikas Yojana S.N o ComponentProgress 2009-10 Progress 2010-11 Provision 2011-12 Phy.Fin.Phy.Fin.Phy.Fin. 1Shade Net House cultivation in Sq.Mtr. 24-30-40- 2Water Harvesting Structures in Nos. 13130.0070263.050187.50 3Plastic Crates in Nos. --50007.50800012.00 Fin. in lac Rs.


Download ppt "Progress of Horticulture Development Schemes Presented by B. L. Jat Assistant Director Horticulture, Jaipur."

Similar presentations


Ads by Google