Presentation is loading. Please wait.

Presentation is loading. Please wait.

SH MIXED DEVELOPMENT WORKSHOP –DAY 1 SUMMARY

Similar presentations


Presentation on theme: "SH MIXED DEVELOPMENT WORKSHOP –DAY 1 SUMMARY"— Presentation transcript:

1 SH MIXED DEVELOPMENT WORKSHOP –DAY 1 SUMMARY
Mixed Dev. Workshop April 2018

2 LENS AND FOCUS Lens Urban Regeneration Precinct Approach Focus
SH as catalyst Develop and protect space in long term for low and moderate income households Precinct land strategy – govt owned land Best use for socio economic intent Release to whom and when Use – SH, Transitional Housing, Affordable rental Single use or mixed market model Focus Mixed market site development Use SH, Transitional Housing, affordable rental, higher end rental, market sectional title, commercial, retail, office Cross subsidisation and integrated inclusive developmnets

3 Mixed Market Continuum
Low Cross Subsidy Potential Moderate Cross Subsidy Potential High Cross Subsidy Potential Lower land values Low moderate market potential Large greenfield Moderate land values Moderate market potential Large greenfield + some larger infill High land values High market potential Small well located sites or combination of sites SH Market rental High end sectional title Offices Higher end retail commercial SH BNG Gap ownership Affordable rental SH Gap ownership Small scale commercial Affordable rental

4 eThekwini PROGRESS JHB Overall strategy and vison - ICHIP
1st precinct identified Detailed land scoping SHI partnership establishment in progress As yet no land/buildings available - disconnect eThekwini

5 INSTITUTIONAL PREPAREDNESS
Structured cross department co-operation Shared vision Approved instruments and institutional capacity Procurement approach, partnerships Incentives packaging Project Programme Precinct identification linked to spatial strategy and govt. land availability City vision/intent for precinct and each site Informs release of land Guides the RFP Needs political buy-in and cross department commitment City involvement in site planning – only as much as required for RFP let developers detail

6 PRECINCT BASED LAND RELEASE
Precinct based Land/building strategy Planned and backed by budget Guided by metro socio economic development intent RFP Crucial framer of form of proposals for procurement assessment Guide responses and not prescribe Vision of of Metro for precinct and site development including socio economic basic must haves Realisable transformation objectives Incentives programme and project(site) based Timing

7 PRECINCT BASED LAND RELEASE
Knowledge of land market RFP Crucial framer of form of proposals for procurement assessment Guide responses and not prescribe Vision of of Metro for precinct and site development including socio economic basic must haves Realisable transformation objectives Incentives programme and project(site) based Timing Cost of bidding Quality of RFP 2 stage bidding?

8 PRECINCT BASED LAND RELEASE
Cross departmental co-operation Developing understanding of different focus and targeting of SH and Pvt for profit developers Level of muni involvement in detailing best use of site but not prescribing deveoper response Metro capacity to assess proposals against socio – economic intent Municipal understanding of the market and risk profile in achieving socio economic objectives

9 PRECINCT BASED LAND RELEASE
Metro understsanding of: land markets Land release for socio economic development (MFMA) Structuring the sharing of risk to ensure that SHI and Pvt developers come to the party. Engagement with key delivery partners e.g. SHIs Incentives Necessary to share risk to achieve socio economic objectives Ensure that incentives are properly targeted Programme and project incentives

10 DETAILED SITE DESIGN AND PLANNING
Detailing - interactive process developer and metro Base proposal chosen through procurement process Right mixture of SH and best for profit element(s) to maximise cross subsidisation of socio economic elements Linkage to the spatial design intent of precinct Ensuring that included incentives are properly targeted

11 DETAILED SITE DESIGN AND PLANNING
Design for neighbourhood inclusivity and functionality Tenure blind design Inclusive semiprivate and public spaces Providing for extra costs of densification Though cross subsidization or extra subsidies SH increase in necessary equity

12 URBAN MANAGEMENT Urban management SRA Revisions
Level city, precinct, neighbourhood Inclusivity important SRA Revisions Various models CIDS emphasises owners right Ekhaya – bottom up includes tenants Tongaat – Development contribution to Engagement of developers and precinct implementers in design and provision of urban management

13 URBAN INFRASTRUCTURE Urban infrastructure investment
Precinct plan needed Linkage of urban infrastructure with socio economic intent Urban infrastructure not sufficient incentive by Metro to achieve necessary socio economic investment

14 OTHER Medium and high rise requires more than SH subsidy
Cross subsidisation Densification subsidy Changes in the RCG

15


Download ppt "SH MIXED DEVELOPMENT WORKSHOP –DAY 1 SUMMARY"

Similar presentations


Ads by Google