Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08

Similar presentations


Presentation on theme: "TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08"— Presentation transcript:

1 TGn Closing Report Jacksonville, FL, US 802 Plenary – 12-16 May ‘08
March 2008 doc.: IEEE /0420r0 May 2008 TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08 Date: Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Sheung Li SiBEAM +1 (408) 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer, Marvell

2 Comments resolved in ONE meeting
May 2008 Draft 4.0 Comments resolved in ONE meeting Bruce Kraemer, Marvell

3 March 2008 doc.: IEEE /0420r0 May 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB124 on Draft 4.0, Move to instruct the editor to prepare Draft 5.0 incorporating these resolutions and begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should n Draft 5.0 be forwarded to Sponsor Ballot?” TG: 17 Approve, 0 Not Approve, 1 Abstain. Bruce Kraemer, Marvell Bruce Kraemer, Marvell

4 Primary Meeting Documents
March 2008 doc.: IEEE /0420r0 May 2008 Primary Meeting Documents Chair’s Opening Report r4 Chair’s Closing Report r0 Meeting Minutes r0 Editor’s Report r0 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

5 TGn Teleconference Plan
March 2008 doc.: IEEE /0420r0 May 2008 TGn Teleconference Plan Call time: 11:00 – 13:00 ET Call number: Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode May 14 Interim May 21 Ballot 5 May 28 June 04 June 11 June 18 TGn Bruce Kraemer June 25 July 02 July 09 July 16 Plenary Bruce Kraemer, Marvell Bruce Kraemer, Marvell

6 May 2008 Time Line proposal No changes to time line dates during this meeting but reassess dates during the July plenary meeting after conclusion of recirculation ballot on D5.0 TG: Approved unanimously Bruce Kraemer, Marvell

7 Currently Published Date
March 2008 doc.: IEEE /0420r0 May 2008 Timeline Events Event Name Currently Published Date Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Recirculation Sponsor Ballot Nov ‘08 Final WG Approval Mar ‘09 Final EC Approval RevCom/ Stds Board Approval Jun ‘09 Publication Jul ‘09 Bruce Kraemer, Marvell Bruce Kraemer, Marvell

8 Ad hoc in July 2008 Request authorization for TGn to hold an ad hoc
May 2008 Ad hoc in July 2008 Request authorization for TGn to hold an ad hoc on Dates July 10, 11 (Thur, Fri) in Denver, CO, US with the venue of choice being the 802 Plenary conference hotel (Hyatt Regency Denver) for the purpose of resolving comments received during LB1xx on Draft 4.0 Bruce Kraemer, Marvell


Download ppt "TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08"

Similar presentations


Ads by Google