Vienna Module Production

Similar presentations


Presentation on theme: "Vienna Module Production"— Presentation transcript:

1 Vienna Module Production
Modules for TEC Ring 2 R2N R2S with Dorazil hybrids, without rigidifiers with final hybrids, but with retro-fitted connectors on the Kapton cable Total: ==> Yet no modules produced for the final production ..... represented by J. Hrubec Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

2 Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik
Modules for Ring 2 Ring 2 Normal Ring 2 Stereo Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

3 Preparation of the frame
Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

4 Vienna / Inst. für Hochenergiephysik
Sensor alignment Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

5 Vienna / Inst. für Hochenergiephysik
Alignment precision 2003 Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

6 Vienna / Inst. für Hochenergiephysik
Bonding Bonding plate for Ring 2 Normal Ring 2 Stereo with rigidifiers Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

7 Vienna / Inst. für Hochenergiephysik
Module test: I-V Module Module Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

8 Module ......26693 module with all channels working correctly
Plots for Deconvolution mode and Inverter ON Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

9 Module ......26698 module with highest number of channels not working
Plots for Deconvolution mode and Inverter ON Channels 342 and 683 open on hybrid Handling accident: damaged bonds, scratch on pitch adapter Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

10 Vienna / Inst. für Hochenergiephysik
Module status 1 hybrid received with distorted bonds (on 3 APV’s): no problems on the module ==> no repair done A few channels open on some hybrids 1 pinhole ==> channel not bonded between sensor and PA 1 module with a handling accident: damaged bonds replaced, scratch on the pitch adapter, module fulfills still the specifications (7 bad channels) 1 module shows frequent I2C problems All modules shipped to Aachen and Lyon Vienna / Inst. für Hochenergiephysik Tracker-week April 2004

11 Vienna / Inst. für Hochenergiephysik
Inventory Modules for TEC Ring 2 R2N R2S Frames Rigidifiers Hybrids After having moved their hybrid test station, the colleagues in FNAL hope to ship hybrids to Vienna this week. Vienna / Inst. für Hochenergiephysik Tracker-week April 2004