Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Maintenance Study Goal Assumptions

Similar presentations


Presentation on theme: "The Maintenance Study Goal Assumptions"— Presentation transcript:

1

2 The Maintenance Study Goal Assumptions
To prevent relapse for ALL children Assumptions Early conduct disorders are persistent and recurrent Treatments that end as soon as the problems first remit may not consolidate gains sufficiently for all families Timely boosters my prevent relapse

3 Design Participants Randomize completers Assessments
Estimated 80 treatment completers Randomize completers Two-year Maintenance Treatment (MT) Follow-up Assessments Only (AO) Assessments Six brief quarterly phone assessments Two major yearly assessments

4 The Maintenance Treatment
Monthly phone calls provide Support Monitoring Intervention Monitoring checks on child behavior problems parent mood/stress parent follow-through with PCIT

5 Three Levels of Intervention
Level I (5-15 minute call) reinforce parent follow through brief suggestions if indicated show concern for parent well-being encourage continued participation

6 Maintenance Interventions
Level II (15-60 minutes) Level I components plus Address identified problem Empathic listening Engage parent problem solving Outline a plan to solve problem Brief follow-up call 1 week later

7 Maintenance Interventions
Level III (a clinic session) When Monitoring call indicates crisis Level II problem has persisted Parent calls and requests clinic session Involves Providing support Problem solving Observing parent-child interactions and coaching if indicated Developing a plan

8 Maintenance Study 1-1-03 81 families enrolled so far
22 families dropped out 19 families currently in treatment 40 families have completed treatment 37 families have completed the post assessments Randomly assigned to either maintenance treatment or control Eyberg & Boggs, NIMH RO1 MH-60632

9 Maintenance Study Standard Treatment Results
In a nutshell CBCL Externalizing Scale

10 ECBI Intensity Scale Eyberg & Boggs

11 ECBI Problem Scale Eyberg & Boggs

12 Beck Depression Inventory
Eyberg & Boggs


Download ppt "The Maintenance Study Goal Assumptions"

Similar presentations


Ads by Google