Mini Case Study LP Steam (Little Burdon)

Similar presentations


Presentation on theme: "Mini Case Study LP Steam (Little Burdon)"— Presentation transcript:

1 Mini Case Study LP Steam (Little Burdon)
LCGP Project Mini Case Study LP Steam (Little Burdon)

2 LP Steam Medium (Little Burdon)
STATISTICS Equipment supplier : Proheat Systems Ltd Method of Preheating : LP Steam Installed preheater capacity : 1,860 kW Peak Site Demand : 710 kW Main Works Contractor : Darke Engineering Commissioned (after head replacement) : June 2017

3 LP Steam Medium (Little Burdon)

4 LP Steam Medium (Little Burdon)
LESSONS LEARNT CE certificate from a notified body. Proheat used Royal Sun Alliance (RSA). This demonstrates design checks have been carried out and the unit is safe for operating at the design pressures with the materials used Carrying out a separate G17 approval for the preheater itself is meaningless (design approval and appraisal covers all aspects of the site construction). 2 Stage burner head. Re-designed as a result of problems following commissioning at Little Burdon. 16 – 18 October 2017, 50%-50% burner head replaced 70% (stage 1) – 30% (stage 2) burner head. Commissioning. Site time, 76 man days of Proheat staff time. (Completed initially by Dec ).