Presentation is loading. Please wait.

Presentation is loading. Please wait.

Future Work Three timelines

Similar presentations


Presentation on theme: "Future Work Three timelines"— Presentation transcript:

1 Future Work Three timelines
Immediate (next week): finalize the Year 2 annual report! Next month, before the NASA PI’s meeting (May 4-6, 2009): Poster Year 3: project expires on May 8, 2010 Datasets WCRP CMIP3 dataset (precip, temp, monthly) NEXRAD precipitation (4-km grids) for Region 12 (Gulf States) River masks (4-km grids) for Region 12 (Gulf States) Land use and land cover (LULC)(4-km grids) for Region 12 (Gulf States) MODIS LAI, Fveg, Tskin,… Water chemistry samplings Modeling Bias-corrected dynamical downscaling Hydrological modeling River routing Water quality modeling Estuary ecosystem modeling Integration (multi-disciplinary and multi-scale) Climate (weather)–water–ecosystems–coastal zone Climate change (current  future) Land use and land cover change

2 Annual Mean LAI ( ) Model MODIS

3 Annual Mean GVF ( ) Model AVHRR

4 Skin Temperature (7/12/2004 21:00UTC)
Model GOES

5 LULC Change ( )

6 Multi-scale Studies


Download ppt "Future Work Three timelines"

Similar presentations


Ads by Google