Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report.

Similar presentations


Presentation on theme: "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report."— Presentation transcript:

1 Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report for Nov. 2014 Date Submitted: Nov. 2014 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: TG10 (L2R) Closing Report for November 2014 Abstract: Closing Report for the TG10 (L2R) Sessions in San Antonio Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1

2 Jul 12, 2010 07/12/10 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing Mesh Networks. ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2

3 Meeting Goals/Status Recap Sept. 802.15 Interim and Current Status
Jul 12, 2010 07/12/10 Meeting Goals/Status Recap Sept Interim and Current Status Review TG10 Status Summary for Joint 802.1/ Session Present TG10 Status Summary at Joint 802.1/802/15 Work on Merging Proposals Adopt Baseline Proposal Review TG10 Timeline and Next Steps Page 3

4 Accomplishments Recapped Sept. 802.15 Interim and Current Status
Jul 12, 2010 07/12/10 Accomplishments Recapped Sept Interim and Current Status Reviewed TG10 Status Summary for Joint 802.1/ Session Presented TG10 Status Summary at Joint 802.1/802/15 Merging of Proposals Continued Baseline Proposal Adopted Reviewed TG10 Timeline and Next Steps Page 4

5 TG Motions Motion for adopting a baseline proposal for TG10.
Jul 12, 2010 07/12/10 TG Motions Motion for adopting a baseline proposal for TG10. Move to approve document # , as the baseline proposal for TG10 and authorize the preparation of a baseline draft (recommended practice) from this document. Moved by: Kojima-san Seconded by: Sato-san Discussion: None Objections: None Vote: Unanimous (6/0/0) Page 5

6 Jul 12, 2010 07/12/10 Minutes Minutes - doc. # Page 6

7 Looking Forward Between Now and Atlanta Mtg. in Jan.
Jul 12, 2010 07/12/10 Looking Forward Between Now and Atlanta Mtg. in Jan. Prepare baseline draft before Jan. Mtg. TG Pre-review of baseline draft before Jan. Mtg. At Atlanta Mtg. in Jan. Finalize baseline draft at Jan. Mtg. Start 1st Letter Ballot after Jan. Mtg. Next Juncture w/802.1 Update at Joint 802.1/ Session in March Mtg. Page 7

8 TG10 Conference Calls Reminder
Jul 12, 2010 07/12/10 TG10 Conference Calls Reminder TG10 Standing Conference Call Info (through Dec. 4) Day: Thurs. Next Call: 20th, Nov. Time: 7AM (Pacific) Conf. #: To Be Sent to TG10 Reflector Page 8

9 TG10 Conference Calls Reminder (cont’d.)
Jul 12, 2010 07/12/10 TG10 Conference Calls Reminder (cont’d.) TG10 Standing Conference Call Info (starting Dec. 8) Day: Mon. Next Call: 8th, Dec. Time: 5PM (Pacific) AM Tues. (Japan, Korea) Conf. #: To Be Sent to TG10 Reflector Page 9


Download ppt "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report."

Similar presentations


Ads by Google