City of Delphos Waste Water Treatment Plant
Membrane Upgrade
2
Old Membranes Cellulose membranes Low durability High sludge build up
High operating pressure
3
Membrane Bioreactor (Aeration Tank)
4
Old Equipment
5
Old Plant Process
6
New Membranes Polymer membranes High durability Low sludge build up
Lower operating pressure Triple stacked; higher filtration
7
New Plant Equipment 3 anoxic tank mixer – 4 hp each
2 pre aeration tank mixer – 4 hp each 1 pre aeration blower – 40 hp 1 aeration blower hp 3 permeate pump – 60 hp each 2 return activated pump – 25 hp each (one backup) Total of 415 hp
8
New Plant Process
9
Savings Summary
10
Savings Summary
11