1 Imbalance Netting Platform
Markus Maurer Balancing Stakeholder Group

2 GLEB Requirements

3 Implementation Framework
By six months after entry into force of this Regulation, all TSOs shall develop a proposal for the implementation framework for a European platform for the imbalance netting process. TSO-TSO Settlement TSO-TSO Settlement Implementation By one year after the entry into force of this Regulation, all TSOs shall develop a proposal for common settlement rules applicable to all intended exchanges of energy Implementation By one year after the approval of (…) the implementation framework (..), all TSOs performing the automatic frequency restoration (..) shall use the European platform to perform the imbalance netting process, at least for the Continental Europe synchronous area.

4 Implementation Framework
Discussion points from last BSG

5 1 2 Discussion points from last BSG
Determination of Cross-Zonal-Capazity 2 Optimization regions

6 Hierarchy of Operational Areas
Synchronous Area consists of (one or more) is sub-area of LFC Block consists of (one or more) is sub-area of LFC-Area consists of (one or more) is sub-area of Monitoring Area consists of (one or more) is sub-area of Scheduling Area

7 SO GL: Definition of imbalance netting
SO GL, Art. 146 (1): The control target of the imbalance netting process shall aim at reducing the amount of simultaneous counteracting FRR activations of the different participating LFC areas by imbalance netting power interchange. Synchronous Area consists of (one or more) is sub-area of LFC Block consists of (one or more) is sub-area of SO GL: Imbalance netting defined on LFC-Area level between LFC Areas LFC-Area consists of (one or more) is sub-area of Monitoring Area consists of (one or more) is sub-area of Scheduling Area

8 Possible Configurations – Impact on CZC
Synchronous Area Bidding Zone Bidding Zone Bidding Zone LFC Block LFC Block LFC Block LFC Block LFC Area LFC Area LFC Area LFC Area LFC Area Bidding Zone LFC Block LFC Block LFC Area LFC Area LFC Area LFC Block LFC Area LFC Area Bidding Zone Bidding Zone Bidding Zone Bidding Zone CZC of border calculated in accordance with Article 37 of the GLEB CZC on this border is considered infinite or equal to the respective technical limit (e.g. bound by number of digits) CZC on this border is not considered and by this equals to infinite in the process

9 Determination of CZC Extraction of ATC values
Day-ahead Market Coupling (Flow-Based) Continous XB Intraday-Market (ATC based) Previous Balancing Actions (ATC based) Imbalance Netting Extraction of ATC values Remaining ATC values after XB-ID Remaining ATC values after Balancing Actions In case XB-Intraday-Market might be flow-based, same ATC extraction as currently done for Day-ahead could be used for the balancing timeframe. Currently determination of ATC values is done by participating TSOs, which send the ATC to the IGCC. Separate function not necessarily needed and by this a very detailed implementation question.

10 1 2 Discussion points from last BSG
Determination of Cross-Zonal-Capazity 2 Optimization regions

11 Optimization Regions - Summary
Compromise achieved by all TSOs Mainly needed for the transition period to not disadvantage first movers (exchanging aFRR) No detrimental effects on the netting potential of TSOs not part of an aFRR cooperation can be seen  No discrimination

12 Optimization Regions – Stepwise Optimization
Opt. step 1: Optimization regions In parallel Opt. region: Prior access to: Opt. step 2: Whole region: Considered borders:

13 Optimization Regions – Impact Assessment
Netted volumes The total netting volume of the smaller optimization region (AT/DE) decreases compared to the scenario without optimization regions. For most of the TSOs within the bigger optimization region the total netting volume increases For a limited number of TSOs the netting volume decreases slightly

14 TSO-TSO settlement

15 TSO-TSO Settlement - Principles
Imbalance Netting import or export shall be settled at a price, different from reference zero price (meaning here a situation where a reference price for all settlement period would be used and set equal to zero) 2 Imbalance Netting shall benefit to all TSO in a sense that no TSO shall loose once the cooperation gets benefits as a whole on a settlement period basis 3 Opportunity prices shall reflect the avoided activation of aFRR

16 TSO-TSO Settlement options
Weighted Average of Opportunity prices plus avoidance of negative individual benefits Equal Benefit per MWh Determination of settlement price (Weighted average of opportunity prices) Determination of overall benefit Settlement of import and export of imbalance netting with settlement price Avoidance of negative individual benefits (redistribution of individual positive benefits to cover individual negative benefits) Distribution of benefit proportional to netted volumes

17 Next steps Timeline

18 Next steps - timeline 2017 2018 2019 1 2 3 4 5 6 7 8 9 10 11 12 NRAs approval of the design NRAs approval of the TSO-TSO settlement Deadline for Accession GLEB EIF Deadline for submission of proposal on European IN platform Deadline for submission of proposal on TSO-TSO settlement DESIGN I – Development of implementation framework DESIGN II – TSO-TSO Settlement Adaption of IGCC in order to fulfil the approved all TSO proposals Governance Algorithm Optimization regions Principles Equations Accession of new IGCC members Impact Assessment Public Consultation

19 Implementation plan Implementierung finalized IGCC INC
Implementation started Partial Implementation E-GCC PT Member No Implementation Status Quo PT IN Implementation

20 Implementation Plan Technical IGCC accession has to be performed sequentially to enable sufficient testing and ensure stable system operation Possible accession order – based on preliminary feedback in PT IN: 2018 2019 Country TSO 1 2 3 4 5 6 7 8 9 10 11 12 Slovenia ELES Croatia HOPS Hungary MAVIR Poland PSE Spain REE Portugal REN Slovakia SEPS Romania Transelectrica Greece Admie Bulgaria ESO Italy Terna Serbia EMS Decision on Communication Infrastructure needed Deadline for Implementation of European platform Communication and SCADA implementation Interoperability tests Operational tests

21 Thank you for your attention
Synchronous Area Bidding Zone LFC Block LFC Area Thank you for your attention