A new mission for UTIAC Paolo Gurisatti Venice, May 10th 2014

Similar presentations


Presentation on theme: "A new mission for UTIAC Paolo Gurisatti Venice, May 10th 2014"— Presentation transcript:

1 A new mission for UTIAC Paolo Gurisatti Venice, May 10th 2014

2 Valle del Chiampo: from a “dump” to a “mine”
Bio-chemical technology for beam-house Technology for sludge inert-isation (and energy production) Technology for “separation” and “valorisation” of waste materials (Zero Waste)

3 Mining? Technical and entrepreneurial challenge
Radical change in perspective

4 Aero - Boat

5 How to meet the challenge?
Boat – New Materials / Speed / Aerodynamic Components Leather – Tracing Materials / Selective Recycling / Smart Reagents

6 First Picture of the Mine

7 R&D The solution is “extracted” by organic solvents (first of all CH2Cl2). After the addition of organic solvent and after extraction four phase emerge. These phases are probably composed by: fat/collagen aqueous phase emulsion organic phase (CH2Cl2)

8 Smart Reagents? Chemicals – Rigid / Stupid
Enzymes – Traditionally Rigid / Stupid What else? What kind of living technology?

9 Is it the right way?

10 No risk at all?

11 New Competences (Research team)
Matteo Chiurato (Chemist, IENI CNR) Valentina Beghetto (Chemist, Università di Venezia) Davide De Lucrezia (Biologist, Explora Bio-Technology srl)

12 New Laboratory

13 How is it working?

14 Research Team - Task Force
Laboratory results (“research team”) are discussed with the “task force” (technicians belonging to various links of the value chain) The evaluation of the most promising extraction technologies leads to the development of prototypes and the simulation of an industrial scale process (costs/effects on the value chain)

15 Investment and Production
Results achieved by the “task force” and “research team” became business plan for UTIAC’s board of directors Articles, publications and contacts with international circuits ( lead to wider consensus and possible financial / industrial partners

16 Timing and Costs Reserve judgment on mine exploitation cannot be removed before one year Extraction technologies will not be available before 3-5 years Let’s check whether it’s possible to cover sunk costs with H 2020 (LIFE is a good starting point)

17 Fulfilled tasks and to do…
June 2013 / May 2014 Research Team Building Task Force Meetings Samples design and analysis Newsletter and participation to international events June 2014 / September 2014 Kick off meeting LIFE+ Agreement among UTIAC and research partners

18 UTIAC 2015 Industrial company specialised in the following businesses:
Tracing of components and processes Slug inert-isation processes / energy production Selective separation of organic materials

19 Experts / People A complex social interaction:
Social Task-Force and Storytelling design Generative relationships / and Dynamic Evaluation of the “happy project” narrative (an others) Community involvement in monitoring innovation and technology design Management of the “tension” between technical artefacts and social problems (emerging)


Download ppt "A new mission for UTIAC Paolo Gurisatti Venice, May 10th 2014"