Download presentation
Presentation is loading. Please wait.
1
MnDOT Operations Division Open House
District 8 - Willmar No notes
2
District 8 Organizational Chart
No notes
3
District 8 Typical Consultant Usage/Trends
Assistance on common pre-letting and post-letting tasks to meet the demands of work load peaks and special projects (surveying, pre-design, design, inspection, etc.) Assistance on large or specialty tasks (Planning and corridor studies, EAs/EISs, etc.) $1.3M annual set-aside for P/T contracts Set-aside generally covers… normal program peaks and CO office contracts (environmental, historical, mapping, etc.) Similar types of work on special program projects (ARRA, BR4MN, CoC, MAP-21, Hwy 23 gaps, etc.) that often come with P/T contract funding Also utilize CO funding for planning and corridor studies, or other “Non-SRC” eligible work
4
District 8 Future Anticipated Needs/Trends
Continuation of past trends and practices Increased need for large project and specialty assistance Increased need for smaller short term staff augmentation assistance Similar philosophy moving forward Growing potential for urban reconstructions, special program projects, accelerated schedule demands Staff augmentation – trial basis – short notice and/or short term need
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.