1 Lancaster “Project” Tracy Rolstad Avista Transmission System Planning

2 Lancaster Request Avista has requested BPA evaluate two options (Lines and Loads Request) Alt A: Loop into Boulder—Rathdrum 230 kV Alt B: Loop into Beacon—Rathdrum 230 kV

3 Lancaster Loop In Five Alternatives Studied by Avista Status Quo
Alt A: Loop into Boulder—Rathdrum 230 kV Alt B: Loop into Beacon—Rathdrum 230 kV Alt C: Noxon—Lancaster 230 kV into Rathdrum Alt D: 230 kV trunk line from Rathdrum

4 Basic One Line Western MT Hydro Cabinet Gorge 500 kV to Grand Coulee
And Montana Libby Lancaster Bell Hot Springs Noxon Rathdrum Boulder Beacon

5

6 Lancaster-Noxon 230 kV Bell-Lancaster 230 kV Beacon-Rathdrum 230 kV Bell-Taft 500 kV Boulder-Rathdrum 230 kV

7 Bell-Taft 500 kV Lancaster-Noxon 230 kV Cabinet-Rathdrum 230 kV Beacon-Rathdrum 230 kV Boulder-Rathdrum 230 kV

8 Superior Option Alternative A
Bring Lancaster into Boulder—Rathdrum 230 kV line “Intercepts” westbound energy before it travels east through the Bell—Beacon complex Increases use of Boulder and Rathdrum stations Decrease use of Beacon and Bell stations Losses are reduced equally for AVA and BPA Perhaps as much as 2 to 3 MW always Technically a “win” for both parties

9 Parameter Status Quo Alt A Alt B Alt C Alt D Total System Losses MW MW MW MW MW NW Area Losses MW MW MW MW MW AVA Owner Losses (MW) 76.71 MW 72.46 MW 72.76 MW 72.40 MW 72.85 MW AVA Owner Losses (MVAr)   MVAr   MVAr   MVAr   MVAr   MVAr Bell 500/230 kV MW MW MW MW MW Bell 230/115 kV MW MW MW MW MW Beacon 230/115 kV #1 MW MW MW MW MW Beacon 230/115 kV #2 MW MW MW MW MW Boulder 230/115 kV #1 MW MW MW MW MW Boulder 230/115 kV #2 MW MW MW MW MW Rathdrum 230/115 kV #1 70.32 MW 77.64 MW 77.28 MW 78.09 MW 77.46 MW Rathdrum 230/115 kV #2 90.80 MW MW MW MW MW Beacon-Bell #4 230 kV MW MW MW MW MW Beacon-Bell #5 230 kV MW MW MW MW MW Beacon-Boulder 230 kV MW 60.88 MW 89.78 MW 79.82 MW 84.69 MW Beacon-Rathdrum #2 230 kV MW MW N/A MW MW Boulder-Rathdrum 230 kV MW MW MW MW Boulder-Lancaster 230 kV MW Lancaster-Rathdrum 230 kV 37.27 MW Beacon-Lancaster 230 kV MW MW Beacon throughflow (MW) MW MW MW MW MW Bell throughflow (MW) MW MW MW MW MW Boulder throughflow (MW) MW MW MW MW MW Lancaster throughflow (MW) MW MW MW MW MW Rathdrum throughflow (MW) MW MW MW MW MW

10 Disclaimers Actually study is performed by BPA
BPA results are presumably definitive BPA study is not yet complete Station expansion will be required Implies all associated issues such as property acquisition, environmental issues, outages, etc